阐述了重庆发电厂 2× 2 0 0MW机组烟气脱硫装置的主要设计参数及工艺流程 ,并结合装置的调试 ,对工艺流程进行了分析
The main design parameters and process flow of flue gas desulphurization unit for 2 × 200MW unit in Chongqing Power Plant are described, and the process flow is analyzed with the commissioning of the unit