剪力墙裂缝的产生是多因素叠加、累加的过程,笔者的观点是:合格的混凝土是混凝土裂缝控制的前提,现场施工的控制是关键,后期合理的养护是保障,我们每控制一项,裂缝产生的几率就会降低一分。带模养护是地下室剪力墙较为常用的养护方法,一般要求带模养护时间不宜少于3天甚至7天,而很多项目在控制拆模时间时更多的是根据材料周转需求,拆模时间不一,有早有晚。但实践证明,拆模时间对竖向剪力墙收缩裂缝的控制有着不可忽视的影响。
The generation of cracks in the shear wall is a process of superposition and accumulation of multiple factors. The author’s opinion is that qualified concrete is the precondition for the control of cracks in concrete, and the control of on-site construction is the key. Reasonable conservation in the later period is the guarantee. We control every item. The chance of cracks is reduced by one point. Formal curing is a common maintenance method for basement shear walls. Generally, the time required for curing with molds should not be less than 3 days or 7 days. While many items are controlled according to the material turnover requirements, the time for mold removal is more Different, early and late. However, practice has proved that the time of mold removal has a non-negligible impact on the control of shrinkage cracks in vertical shear walls.