京哈线既有团山站是新建松陶线在京哈线上的接轨站,松陶线正线和疏解线并行既有京哈线于车站长春端咽喉引入该车站。针对团山站的改扩建方案和主要工程内容,分析团山站在施工中存在的问题,提出团山站施工过渡的原则和工务、电务、接触网三方的具体施工方案。
The existing Gongsan station on the Jingha line is the connecting station for the newly built Songtao Line on the Jingha Line. The main line of the Songtao Line and the relieving line are concurrently introduced into the station through the existing Jing-Ha Line at the Changchun-side throat of the station. According to the project of reconstruction and expansion of Tuan Mountain Station and the main project contents, the problems existing in the construction of Tuan Mountain Station are analyzed. The principle of construction transition of Tuan Mountain Station and the concrete construction plan of the three sides of public works, electricity and catenary are put forward.