论文部分内容阅读
在工程施工中,常常会发现一些现场技术人员对工程质量把关甚严,特别是对创优工程的检查验收,更是严格要求控制在施工验收规范允许的误差范围内。然而,在现浇钢筋混凝土楼面模板分项工程验收中,如果也完全按照标准来验收,就个人观点来看,似乎有些不妥。
In the construction of the project, it is often found that some on-site technicians have very strict control over the quality of the project, especially for the inspection and acceptance of the project of excellence. More strictly, the control is required within the scope of the allowable error of the construction acceptance specification. However, in the cast-in-place reinforced concrete floor template sub-project acceptance, if also in full accordance with the standard to accept, from a personal point of view, it seems a bit wrong.