在土方路基施工的过程中,路基施工控制有着不容忽视的重要作用,尤其是在含水量高的土方路基施工中,土方中含水量的高低直接影响着施工进度与质量。在土方工程中含水量过高容易引起泛浆、弹簧等多种病害,而含水量过低却又容易形成土质疏松,甚至是在施工中扬沙起尘,造成路基压实度的控制难度增加。因此只有在工作中确定最佳的汗水量进行碾压作业,才能够得到满意的压实效果和高质量的施工成果。现简要分析了路基土方施工中的含水量和汗水控制措施,通过各种施工措施和技术要点分析与总结,进而为日后同行工作提供参考。
In the process of earthwork embankment construction, subgrade construction control has an important role that can not be ignored, especially in the earthwork embankment construction with high water content, the soil moisture content in earthwork directly affects the construction progress and quality. The high water content in earthworks is likely to cause many diseases such as pan, spring and so on. However, the water content is too low, but it is easy to form loose soil. Even in the construction, it is more difficult to control the degree of subgrade compaction . Therefore, only in the work to determine the best amount of sweat rolling operation, can be satisfied with the compaction and high-quality construction results. Now a brief analysis of subgrade earthwork construction water content and sweat control measures, through a variety of construction measures and technical analysis and summary, and thus provide reference for future work counterparts.