五月中央全国防汛会议后,六月中旬我们即遵照会议精神在开封召开了黄河下游三省的防汛会议,结合当前黄河情况,具体的研究了防御异常洪水的对策,并部署了工作。山东、河南亦于六月先后召开了省的防汛会议,总结了春工,布置了防汛。平原因为防御二三、○○○秒公方洪水复堤工程尚未结束,马上转入防汛尚有困难,所以布置较晚,至七月初始开了省的防汛会议,进行了春工总结,把防汛工作布置下去。黄河防御二三、○○○秒公方洪水,争取二九、○○○秒公方洪水不使溃决,是非常艰巨的任务,只有坚决依靠群众,大力
In May, following the National Flood Control Conference held in mid-June, in line with the spirit of the conference in mid-June, we convened a flood control conference in the lower three provinces of the Yellow River in Kaifeng. Based on the current situation of the Yellow River, we have specifically studied the countermeasures against defensive floods and deployed our work. Shandong and Henan also held flood control conferences in June in succession in June. They summed up Chun Engineering and arranged flood control. Plain Because the defense of two or three, 000 second public floodwater dike project is not over yet, immediately into the flood control is still difficult, so the layout later, to the beginning of July opened a flood control conference in the province, carried out the spring workers concluded that the Flood control work layout down. It is a very arduous task for the Yellow River River to prevent floods of the public square in 2000 and 2000 and fight for the flood of the public squares in 2000 and 2000. It is a very arduous task. Only by resolutely relying on the masses and vigorously