深井井点降低地下水位的质量控制方法

来源 :珠江现代建设 | 被引量 : 0次 | 上传用户:a281000075
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
建筑物的基底高程低于地下水位时,必须采取措施降低地下水位后才可以开挖基坑,以保证施工的正常进行。对于具有多元结构的建筑物地基,上层为弱透水层,下层为强透水层,并具有承压水位,或基坑要求的降深较大时,一般选用深井井点降低地下水位。结合具体工程实践,就深井井点降低地下水位的前期准备工作及施工过程中的有关问题提出一些控制质量的方法。 When the building’s basement elevation is lower than the groundwater level, measures must be taken to reduce the groundwater level before the foundation pit can be excavated to ensure the normal construction. For the foundation of buildings with multiple structures, when the upper layer is a weak aquitard, the lower is a strong water permeable layer and has a pressure bearing water level, or the deep descent required by the foundation pit is large, deep well points are generally selected to reduce the water table. In combination with the specific engineering practice, some methods to control the quality of groundwater level in deep well sites during the preparatory work of lowering groundwater level and related issues in the construction process are put forward.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
主持人,你好:几年前,我单位有职工发生工伤,单位给负工伤的职工一个月600元补助待遇,没有定残。现在负伤职工要求单位按照国家规定给予补偿,请问企业应该怎么做?山东烟台网友
火力发电厂工程施工中,预应力双T形板的预应力钢筋冷拉,多采取大吨位慢速卷扬机配以滑轮组、测力计进行。这种作法存在操作不便、控制不准、不够安全等缺陷。如用钢筋液压拉
你一定很想知道,这“跑腿”的都要干些啥?告诉你们吧,就是帮老师送东西!你一定会认为,帮老师做事多光荣啊!可是,你不知道,光昨天我就跑了五六趟呢!第一次呢,我是帮老师把文件
吉林省关东建筑设计院有限责任公司成立于1993年,现有员工43人。院下属为建筑设计所和景观规划所。本着追求设计精细化、服务现场化的宗旨,先后与长春中海、长春融创、长春天
阳光明媚的中午,学校人工湖边是最吸引同学们的地方。你瞧,一群群鱼儿在水里欢快地玩耍着:时而一动不动, 好像在思考什么;时而游来游去,好像在寻找食物;时而跳出水面,呼吸新
我已经是一个七年级的学生了,但我丝毫没有高兴的感觉。因为班上人人都瞧不起我,甚至我们的老师——凯丽小姐也是如此。她把我安排在教室的最后一排,而我的前面则是我们班个
我的奶奶真唠叨。早晨,我还没睡醒,奶奶就开始唠叨了:“薇薇,快点起床啦!太阳晒到屁股啦!饭菜都凉啦!”没办法,我只好极不情愿地从床上爬起来,下楼去吃饭。奶奶一看到我,又开
一群鸫鸟准备飞到樱桃园里偷吃樱桃。临飞前,领头的鸫鸟说:“大家一定要记住,樱桃虽然好吃,但我们不能太贪,因为在樱桃园里呆久了,就会被守园人发现, 那时我们就有性命之忧了
2016年12月8日,天津市人力社保局、市民政局、市外专局联合召开了天津市2016年外籍人才“我眼中的美丽社区”建言座谈会,天津市外籍人才及其所在单位负责人、各区民政局负责