论文部分内容阅读
本文以催化分馏塔为例,校核了该塔设备吊装过程的稳定性,确定了优化的吊装方案,给出了催化分馏塔的吊装工艺,确定了吊装过程。
In this paper, the catalysis fractionation tower is taken as an example to check the stability of the lifting process of the tower equipment and to determine the optimized lifting scheme. The lifting technology of the catalytic distillation tower is given and the lifting process is determined.