在二滩电站工地,中国水利水电工程总公司八局和葛洲坝工程集团作为中国参加施工的两支最大的正规军,都把二滩作为学习国外先进施工管理技术,培养人才的大课堂,同时,积极适应FIDIC模式,为今后走向国际市场打基础。然而,这一切却经历了耐人寻味的一波三折。 在国际招标中,水电八局与意大利英波吉诺、托诺公司,法国的杜美思、吉梯姆公司组成的联营体中标大坝工程,即Ⅰ标。联营体以股份制形式组建,八局
At the Ertan power station site, the Eighth Bureau of the China Water Conservancy and Hydropower Engineering Corporation and the Gezhouba Engineering Group, two of China’s largest regular troops participating in the construction, used the Ertan as a big classroom to learn advanced foreign construction management techniques and cultivate talents. Adapt to the FIDIC model and lay the foundation for the future to enter the international market. However, all this has experienced an intriguing twist. In the international bidding, the hydropower 8th Bureau and Italy’s Inggano, Tono’s company, France’s Duomeisi, and Gitmem have jointly won the bid for the dam project. Joint ventures are formed in a joint-stock system, with eight innings