论文部分内容阅读
本文以我国比较成熟的燃煤火力发电厂300MW机组的主厂房框架结构的高支模为例,介绍了高支模方案的计算过程及要点。
This paper takes the high-mode model of the main plant frame structure of the 300MW unit of the coal-fired power plant in China as an example, and introduces the calculation process and key points of the high-mode mode.