基于北京地铁10号线国贸站换乘通道风险源的施工设计,介绍设计中采取的关键工程措施及开挖模拟计算结果,提出施工中应注意的问题。
Based on the construction design of the risk source of the interchange passage of Guomao Station in Beijing Metro Line 10, the key engineering measures and the simulation calculation results of the excavation are introduced, and the problems that should be noticed in the construction are put forward.