论文部分内容阅读
山东省第二条高速公路——济德高速公路如期开工了。它是交通部确定的全国12条公路主干线北京至宁波高速公路的一部分,也是山东省“三纵三横一环”公路主骨架的重要组成部分。济德高速公路全长119.25公里,分两期建设,第一期工程为德州至齐河段(北段),长度为91.28公里;第二期工程为齐河至济南段(南段),其中黄河大桥主桥、引桥和路堤总长度为5.6公里。全线计划投资30亿元,预计1998年建成通车。
Shandong Province, the second highway - Jide Expressway started as scheduled. It is part of the 12 main roads of the country identified by the Ministry of Communications as the Beijing-Ningbo Expressway, and also an important part of the main framework of the “Three Vertical, Three Horizontal and One Ring” roads in Shandong Province. The total length of the Jide Expressway is 119.25 kilometers and it will be constructed in two phases. The first phase of the project is the section from Texas to the Qihe (northern section) with a length of 91.28 kilometers. The second phase of the project is from Qihe to Jinan (southern section) The main bridge, bridge and embankment of the Yellow River Bridge a total length of 5.6 km. The entire project plans to invest 3 billion yuan, is expected to be completed and opened to traffic in 1998.