机制山砂在株六铁路复线施工中的应用

来源 :路基工程 | 被引量 : 0次 | 上传用户:weinziel
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
株六复线施工中河砂极度匮乏,采用机制山砂替代河砂。介绍机制山砂的物理性能指标与标准值的比较分析后认为,机制山砂代替河砂可以满足规程要求。通过机制山砂与河砂的应用比较,表明机制山砂拌制的砼坍落度大、和易性好,强度提高;通过掺入SWR减水早强剂,解决了机制山砂含泥量大的问题,既保证了工程质量,又收到良好的经济效益。 The strain of river sand in the construction of Shuangliu Double Line is extremely scarce, and the mechanism of replacing the river sand with mountain sand is adopted. Introduction mechanism Comparison of the physical properties of mountain sand and the standard values ​​that the mechanism of sand instead of river sand to meet the regulatory requirements. Through the comparison of the application of the mechanism of sand and river sand, it shows that the mechanism of sand mixed with concrete has a large slump and good workability, and the strength is improved. By incorporating SWR water-reducing agent, Large problems, not only to ensure the quality of the project, but also received good economic benefits.
其他文献
【正】 35年以后,日本65岁以上的老年人口将达3,200万人,几乎达总人口的1/4。厚生省人口问题研究所1986年8月22日发表了以1985年《国势调查》为基础而测算的《日本将来人口的
在钻探中,经常发生钻杆共振引发的埋钻、废孔等事故。采用ANSYS软件,分析了几种不同孔深时钻杆扭转振动的固有频率,结合计算公式得出了XY-44钻机工作的临界转速。通过调整转速改
柳州市对养护的道路、排水设施加大维修力度,以市中心道路为主线向城乡结合部推进方式,对一些道路人行道、车行道进行“填平补齐”维修,对一些道路弯渠进行疏通清理。并安排专人
介绍了双向搅拌桩的原理、特点和施工方法,并根据京沪客运专线DK147+798-DK155+990(III标段)路基,采用双向搅拌桩加固深厚软土地基的试桩,验证了双向搅拌桩的应用效果,说明双向搅拌桩
国庆期间,百色市市政管理部门抓好向阳路、中山一、二路、解放街、江滨路、城东路、各主要景点等重点路段、重要部位的市容市貌整治和管理。10月5日,共纠正违章摊点48个,取缔各
<正> 吉林市根据国家和省有关部门的规定,对避孕药具管理工作进行了改革,在实行目标管理上做了一些初步探索。目标管理从制定到完成,是通过计划、实施、检查、总结,即PDCA四个阶段的循环过程来实现的。避孕药具的目标管理也是按照PDCA循环的工作程序进行的。P代表计划,也就是目标;D代表具体的实施;C代表工作的检查和考核;A代表总结。通过总结经验找出差距,订出新的目标,进入下一个循环。如果把目标
本文对76m大跨度干煤棚网壳的施工进行了概要总结,重点从工程概况、施工方法综述、网壳安装等方面进行了论述,并对该工程施工时采用的拔杆整体提升法的细节及注意事项进行详细
我国目前已经成为建设项目投资最大的地区,加强建设项目的管理,提高投资效益已经成为重要的课题。基于活动的管理是现代管理理论中一种先进的管理思想,适应了现代建设项目管理的
目的:报告了部分带骨膜髌骨翻转成形术治疗髌股关节紊乱症的疗效。方法:用部分带骨膜髌骨翻转修复髌骨关节软骨脱落。结果:术后随访一年余,按Fabbriciani分级标准,运动、功能综合
针对目前部分水泥试验室对ISO法新标准水泥试验室建设的要求认识不够,设施不符和标准要求的问题,以对比试验数据来研究探讨影响水泥ISO法强度检验的若干因素及其影响幅度,以