论高土石坝的泄洪问题

来源 :人民黄河 | 被引量 : 0次 | 上传用户:duzhiwei1010
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、前言当前世界高坝发展的趋势,当地材料坝所占比例愈来愈大,高度也愈来愈高。国外已建100米以上的高坝,1952年前共有42座,土石坝仅占31%,至1975年已建和在建100米以上高坝则有371座,土石坝已占62%。从坝高来看,三十年代混凝土坝的高度已达221米,六十年代为285米,此后没有发展;而土石坝的高度却一直在增加,三十年代为121米,六十年代为 I. INTRODUCTION In the current trend of world high dams, the proportion of local material dams is increasing and the height is getting higher and higher. Abroad has been built more than 100 meters high dam, a total of 42 before 1952, earth-rock dams accounted for only 31%, to 1975 and under construction in the 100 meters high dam there are 371, earth dam accounts for 62%. From the height of the dam, the height of the concrete dam in the 1930s reached 221 meters and was 285 meters in the 1960s, but has not developed since then; however, the height of earth-rock dams has been increasing from 121 meters in the 1930s to
其他文献
水总派出技术组去天生桥水电工程现场查勘了解,共同研究帮助工作:据电力部领导提出的意见,水力发电建设总局最近派出有水总、水科院、中南院、昆明院、东勘院、水电八局和三
据国土资源报2001-06-29报道:已经运行了半个多世纪的我国矿产资源储量统计制度将发生重大变革,从明年1月起,这项内容将桉《固体矿产资源/储量分类》国家标准实施。为此,国土资源部
世界最大的潮汐发电站是法国朗斯水电站(La Rance),位于法国朗斯河口圣·马洛城附近。该处最大潮高13.5米,最大潮流量18,000立方米/秒。拦潮坝长750米,电厂长386米,安装有24
(一)排水标准扣排水方案选定的意义排水标准和方案的比較选定是排水规划設計中最主要的工作,它决定着整个工程的規模及措施,所采取的标准及方案,不但在技術上应是可能的,在
1造林前的准备1.1组织安排雨季造林时间性要求高,抓住造林时机很重要,这就要求必须提前做好安排准备工作,雨季到来之后行动要快,动作要迅速,才能取得事半功倍的效果。首先要
一种柴油燃料和润滑油消泡剂和原油破乳剂 ,以及这些药剂的使用方法。具体说 ,这些消泡剂和破乳剂由共聚物组成 ,该共聚物有构成聚硅氧烷主链的结构 ,并有一个有机基团接枝到
蒙太奇是一种特殊的视觉载体,通过图像、声音、时间生动的把信息传达给观众。在影视广告的制作中运用蒙太奇不仅可以表现广告内涵,还可以根据广告脚本所表达的主题,通过后期
电影《沉睡魔咒》取材于格林童话《睡美人》,其用了大量篇幅来刻画女性形象,使人观影后印象深刻,本文将通过对女性角色的强化,男性角色的弱化,以及女性同盟的达成和救赎来简
一、主要零部件市场概况汽车零部件是汽车工业的基础,世界上的汽车大国都是从建立零部件工业开始,发展到整车生产。随着汽车工业的发展,汽车主机厂逐步降低自制率,零部件由