摘 要:土石坝是指由土、石料等当地材料建成的坝,是历史最为悠久的一种坝型。近代的土石坝筑技术自20世界50年代以后得到发展,并促成了一批高坝的建设。目前,土石坝是世界坝工建设种应最为广泛和发展最快的一种坝型。
质量控制和检查是土石坝施工中极重要的一环,它应贯穿于各施工环节及施工全过程。一个完整的土石坝现场施工质量控制应包括坝基防渗与岸坡处理、料场作业、坝体填筑、反滤排水工程、护坡工程等。
关键词:土石坝;质量控制;检查
Abstract: The embankment dam is built of local materials such as earth, stone dam, is the oldest dam type. The modern embankment dam building technology from the 20 world 50 years after the development and contributed to a number of the construction of the High Dam. , Earth dam is the world of dam construction species should be the most extensive and fastest-growing one type of dam.
Quality control and inspection is the Dam Construction extremely important, it should be throughout the construction sectors and the whole construction process. A complete embankment dam site construction quality control should include the Foundation Impervious the bank slopes processing, stockyard operations, dam filling, filtration drainage works, slope protection works.
Key words: embankment dam; quality control; checks
1.雨季土坝压实施工控制
土石坝填筑系大面积的露天作业,施工过程中遇到雨天,会给控制土壤含水量带来很大的困难。因此在多雨地区,常由雨天多,土壤含水量高,雨后不能立即恢得上土,一致雨季粘性土料的填筑成为控制工程进度的主要关键所在。为了保证工程按质又不过多的增加成本,可采用下列措施。
①合理进行大坝断面设计,尽量缩小防渗体(心增,或斜增)的断面,减少粘性土料的用量。
②在降雨时,坝上应停止粘性土料的填筑。在多雨地区宜采用气胎辗。如采用羊足辗时,要同时配使用平辗,以便在雨前封闭坝面以利排水。为了便于排走雨水,坝填筑面应略向上游倾斜。
③必要时在土料储料场和坝面采用人工防雨措施,例如,备用打防雨布或塑料薄膜。遇雨遮盖填筑面,雨后去盖,将表面湿土稍加清理晾晒,即可上土复工。在创进度赶拦洪时,为了保证高速度施工,在防渗体填筑面积不太大时,在多雨地区可以考虚采用雨棚作业。雨棚一般为简单层架式,用帆布或塑料布覆盖,不过棚内填土,辗压不便,棚架升高也麻烦,因此也有采用缆索悬挂式吊棚的。
④在雨季施工中,重要的是在非雨期时于坝面附近储备数量足够、质量合格的土料,以供雨季施工时使用。
⑤合理选用某种非粘性土料作为大坝防渗体,在采取一定的施工措施,就有可能在雨季断续施工。
⑥要实施施土控制需土石坝监测仪器。
2.冬季施工
在冬季负气温下,土料将发生冻结,并使其物理力学性质发生变化,这对土石坝冬季施工将造成严重影响。不过只要采取适当的技术措施,仍能保证填筑质量。
防止料场中的土料冻结,是土石坝冬季施工的主要内容。为此,可采取以下措施:
①选择冬季施工的专用料区:对砂砾粒应选择粗粒含量较多和易于压实的地区,在夏、秋季进行备料,并且明沟截流和降低地下水位,使砂砾料中的细料含水量降低到4%以下;对于粘性土宜选择运距近、含水量接近塑限及地势较高的料区,如含水量较大,须在冬季前进性处理,以满足防冻要求。因此,如有可能,应选用向陷背风的料区。
②料场表土翻松保温:冬季结冰前将料区表土翻松30~40CM深,并碎成小坝耙平,使松土的孔隙中充满空气,因而可以降低表层土的导热性,防止下部土料冻结。
③覆盖融热材料保温:根据气温和现场条件,利用树叶、稻草、炉碴及锯木屑等材料,覆盖于土区或土库表面,形成蓄热保温层,使土料不致冻结。
④覆盖冰、雪蓄热保温:可以利用自然雪或人工铺雪于料场表面土上。由于雪的导热性能低,可以达到土料蓄热保温不致冻结的目的。或者也可将料场四周用0.5m高的土埂围起来,并在场内每隔1.5m大一根承冰层的支撑木桩,冬季来临时,在土埂内充满水,待水面结冰到10~15cm厚时,将冰层下的水排走,而形成一个很好的空气隔热保温层,这也可以达到使土料不致冻结的目的。
除了防止料场土料冻结外,在土料运输过程中,也应注意土料保温:
①土温的散失主要是在装卸过程中,因此应采取快速运输,避免转运,力求从装土到御土铺填为止的时间,不超过土料冻结所需时间。
②尽量采用容量大、调度灵活及易于倾卸的运输工具,并进行覆盖保温。为了防止土料与金属车厢直接接触,可设置木板隔层,或在车厢内垫一层浸透食盐水(浓度为20%)的麻袋。
质量控制和检查是土石坝施工中极重要的一环,它应贯穿于各施工环节及施工全过程。一个完整的土石坝现场施工质量控制应包括坝基防渗与岸坡处理、料场作业、坝体填筑、反滤排水工程、护坡工程等。
关键词:土石坝;质量控制;检查
Abstract: The embankment dam is built of local materials such as earth, stone dam, is the oldest dam type. The modern embankment dam building technology from the 20 world 50 years after the development and contributed to a number of the construction of the High Dam. , Earth dam is the world of dam construction species should be the most extensive and fastest-growing one type of dam.
Quality control and inspection is the Dam Construction extremely important, it should be throughout the construction sectors and the whole construction process. A complete embankment dam site construction quality control should include the Foundation Impervious the bank slopes processing, stockyard operations, dam filling, filtration drainage works, slope protection works.
Key words: embankment dam; quality control; checks
1.雨季土坝压实施工控制
土石坝填筑系大面积的露天作业,施工过程中遇到雨天,会给控制土壤含水量带来很大的困难。因此在多雨地区,常由雨天多,土壤含水量高,雨后不能立即恢得上土,一致雨季粘性土料的填筑成为控制工程进度的主要关键所在。为了保证工程按质又不过多的增加成本,可采用下列措施。
①合理进行大坝断面设计,尽量缩小防渗体(心增,或斜增)的断面,减少粘性土料的用量。
②在降雨时,坝上应停止粘性土料的填筑。在多雨地区宜采用气胎辗。如采用羊足辗时,要同时配使用平辗,以便在雨前封闭坝面以利排水。为了便于排走雨水,坝填筑面应略向上游倾斜。
③必要时在土料储料场和坝面采用人工防雨措施,例如,备用打防雨布或塑料薄膜。遇雨遮盖填筑面,雨后去盖,将表面湿土稍加清理晾晒,即可上土复工。在创进度赶拦洪时,为了保证高速度施工,在防渗体填筑面积不太大时,在多雨地区可以考虚采用雨棚作业。雨棚一般为简单层架式,用帆布或塑料布覆盖,不过棚内填土,辗压不便,棚架升高也麻烦,因此也有采用缆索悬挂式吊棚的。
④在雨季施工中,重要的是在非雨期时于坝面附近储备数量足够、质量合格的土料,以供雨季施工时使用。
⑤合理选用某种非粘性土料作为大坝防渗体,在采取一定的施工措施,就有可能在雨季断续施工。
⑥要实施施土控制需土石坝监测仪器。
2.冬季施工
在冬季负气温下,土料将发生冻结,并使其物理力学性质发生变化,这对土石坝冬季施工将造成严重影响。不过只要采取适当的技术措施,仍能保证填筑质量。
防止料场中的土料冻结,是土石坝冬季施工的主要内容。为此,可采取以下措施:
①选择冬季施工的专用料区:对砂砾粒应选择粗粒含量较多和易于压实的地区,在夏、秋季进行备料,并且明沟截流和降低地下水位,使砂砾料中的细料含水量降低到4%以下;对于粘性土宜选择运距近、含水量接近塑限及地势较高的料区,如含水量较大,须在冬季前进性处理,以满足防冻要求。因此,如有可能,应选用向陷背风的料区。
②料场表土翻松保温:冬季结冰前将料区表土翻松30~40CM深,并碎成小坝耙平,使松土的孔隙中充满空气,因而可以降低表层土的导热性,防止下部土料冻结。
③覆盖融热材料保温:根据气温和现场条件,利用树叶、稻草、炉碴及锯木屑等材料,覆盖于土区或土库表面,形成蓄热保温层,使土料不致冻结。
④覆盖冰、雪蓄热保温:可以利用自然雪或人工铺雪于料场表面土上。由于雪的导热性能低,可以达到土料蓄热保温不致冻结的目的。或者也可将料场四周用0.5m高的土埂围起来,并在场内每隔1.5m大一根承冰层的支撑木桩,冬季来临时,在土埂内充满水,待水面结冰到10~15cm厚时,将冰层下的水排走,而形成一个很好的空气隔热保温层,这也可以达到使土料不致冻结的目的。
除了防止料场土料冻结外,在土料运输过程中,也应注意土料保温:
①土温的散失主要是在装卸过程中,因此应采取快速运输,避免转运,力求从装土到御土铺填为止的时间,不超过土料冻结所需时间。
②尽量采用容量大、调度灵活及易于倾卸的运输工具,并进行覆盖保温。为了防止土料与金属车厢直接接触,可设置木板隔层,或在车厢内垫一层浸透食盐水(浓度为20%)的麻袋。