华北区今年的建筑工程,由于任务下达较迟,设计赶不上施工,因此绝大部分工程都要挤到第三季度来做,为做好充分的思想准备与组织准备,避免工作中的紊乱现象,保证工程质量,华北行政委员会建筑工程局于七月中旬向华北各省、市建筑工程局和直属公司作了如下几点指示。首先,必须抓紧与各建设单位把全年任务逐项进行一次认真的审查;并加以安排,作出包工计划。(一)凡计划任务书业经批准,地址、结构、面积、造价已确定,设计资料已备齐或可备齐者,应迅速组织力量,限期完成勘测设计与估算工作;凡出图较早,主要材料无问题,今年可能完工者,应在保证质量的前提下,争取完工。(二)凡计划任务书尚未批准,设计资料不全,任务变化不定而不能早日出图,或虽已出
This year’s construction work in North China will not be able to catch up with the construction due to the late issuance of tasks. Therefore, the vast majority of projects must be pushed into the third quarter. In order to fully prepare their minds and organize their preparations, and avoid any disturbances in their work, To ensure the quality of the project, the North China Administration Bureau of Construction and Engineering Bureau in mid-July to the provinces of North China, City Construction Engineering Bureau and its subsidiaries made the following instructions. First of all, we must make every effort to conduct a careful review of the annual tasks one by one with the construction units; and make arrangements to make plans for them. (1) Where the address, structure, area and cost of the plan and task book have been approved and the design materials have been prepared or ready, the survey and design and estimation work should be completed within a short period of time; There are no problems with the main materials. Those who may be completed this year should strive for completion on the premise of ensuring the quality. (B) Where the planning mission statement has not been approved yet, the design information is incomplete, the task is subject to change and can not be set out as soon as possible,