摘要:随着建筑的发展高层建筑的建设,在不影响毗邻建筑物沉降的施工方法中,深基坑支护已经成为首选的施工方案。由于深基坑支护包括挖土、挡土、围护和防水等项目的施工,任何一个中间过程的失误都可能导致施工事故,因此是一项复杂的系统工程。本文作者根据多年的施工工作对建筑深基坑支护的重要性作了分析,并对深基坑支护信息化的施工和施工中的一些突发事件的预防及应急措施进行了详细阐述。
关键词:建筑工程;深基坑支护;施工探讨
Abstract: With the development of high-rise building construction, in does not affect the construction method of adjacent buildings, deep foundation pit construction scheme has become the preferred. The support comprises construction project excavation, retaining, and waterproof enclosure of deep foundation pit, any intermediate process errors may lead to the construction accident, so it is a complicated system engineering. The author of this paper according to the construction work for many years, analyses the importance of building deep foundation pit supporting, and prevention of deep foundation pit support the information construction and construction of some unexpected events and emergency measures were described in detail.
Keywords: construction engineering; construction of deep foundation pit support;
中图分类号:TU74
一、深基坑工程的开挖
深基坑开挖施工前,施工单位应根据地质勘探的资料和水文气候情况,结合自身深基坑工程施工的经验和现场条件编制施工组织设计。施工组织设计的主要内容包括:基坑的支护、 基坑的开挖、施工平面布置图、降水措施、施工监测布置等。开挖要综合考虑开挖过程中基坑的受力特点,不能局部一次开挖到基底,使开挖区土体侧压力急剧释放,引起坑壁侧向位移。除此之外还要有专项施工方案和突发事件的应急预案。基坑的开挖施工是一个循序渐进的过程,应尽量做到一边施工一边监测,并遵循“分层开挖,先撑后挖,随挖随撑,对称均衡,限时限量”的施工原则,杜绝野蛮施工和盲目施工,并对施工过程加强控制,保证基坑支护安全顺利地完成。承担施工的单位要严格按照经过审批的施工组织设计及相关的施工规程和技术规范进行开挖,同时要加强施工过程中的监测。在土方开挖施工前要充分掌握工程所在地的地质勘测报告、周围建筑物和地下管线等设施的情况。对特殊土质更是要根据土质的不同进行施工组织设计,比如在膨胀土地区施工应避开雨季施工,在开挖过程中要充分关注膨胀土的特点,确保土体含水量的变化不大,从而使基坑支护尽可能受到土体膨胀压力的影响。在软土地区开挖时,分层深度不宜太大。这是因为如果挖土高差太大或挖土进度过快,就会打破土体原有的力学平衡,使其抗剪强度降低,使土体容易出现水平滑移,增大支护设施的额外压力,最终可能导致支护发生破坏而出现坑壁坍塌。
二、深基坑的止水
在地下水位较高的地区进行深基坑的开挖,地下水会对施工产生一定的危险。特别是在水源复杂地区,在制定止水方案时要充分掌握基坑周围环境地质水文资料,认真分析地下水的来源和成因。在大城市基坑周围建筑密集的情况下,切不可仅凭抽水降低地下水位。这样导致基坑周围土体排水固结引发的周围建筑物不均匀沉降的事故举不胜举。一旦出现这种灾难性的情况将大大增加处理难度。因此,止水要从防水、降水和排水三个方面进行综合考虑。深基坑的止水有许多方式,一般都是几种方法结合在一起。如有深层水泥搅拌桩连续墙、护壁桩水泥搅拌桩共同形成防渗墙、护壁桩高压旋喷桩组合防渗墙、地下连续墙、深基坑土钉與止水帷幕复合支护、单排桩结合止水帷幕、截水帷幕体系及复合支护等。止水帷幕是高地下水位地区深基坑支护施工中常用的一种止水措施,其施工方法主要是通过高压喷射把水泥浆和含有化学成分的浆液注入到地下,降低土体含水量,增强土体抗剪强度的目的。浆喷深层搅拌法和粉喷深层搅拌法通过搅拌把掺加剂(液)和高含水量的土体进行混合,从而达到降低土体含水量、增强土体强度的目的。在浆喷深层搅拌法和粉喷深层搅拌法施工中要特别注意搅拌桩的施工质量。通过合理计算确定水泥浆掺加量,一要保证桩体搅拌均匀;二要确保施工桩长达到设计深度后桩头部位还有浆,避免桩头处出现搅而无浆的情况。在土层情况变化较大的地区,施工要严格按设计进行,保证桩的搭接距离和桩身密实,杜绝空洞、蜂窝及桩头开叉的施工质量问题,避免出现因施工质量导致的止水失效。
三、深基坑施工的安全工作
3.1在技术方面应做的工作
1) 组成从项目经理到施工班组长的技术交底班子。充分认识深基坑支护设计与施工所要达到的目的和作用,并让每位参与者都熟悉施工的每一个环节,严格执行有关规范,做到监督和管理的作用,确保施工技术方案的实施。
2) 按图施工,动态监控。深基坑支护工程主要以挡土、防水等为主要目的,而设计的单一或复合挡土支护结构,有理论依据和可行性,必须尊重设计、按图施工,但施工中的不确定因素及设计所依据的资料有可能与实际情况不一致,要求在施工中必须依据实际的情况,相应作出一些调整,达到规范要求。
3.2在质安管理方面的工作
1、施工中应及时做好材料送检工作,所用材料必须有出厂合格、送检合格后方可使用,杜绝使用不合格材料。建立以人、物为中心的安全管理体系。建立以项目经理为核心的安全管理体系(从技术上、生产安全上) 选任得力、专业性强、安全意识强的人作安全员,并相应明确安全职责,签订安全合同书。做好安全教育
2、工作,牢固树立“安全第一、预防为主”的生产方针,做好“五同时”教育工作,将各项安全工作落实并强化到人,提高全员安全意识。制定并做好质量安全检查措施,列表列出常见施工事故和施工质量隐患或通病的出现部位,产生原因,预防和补救措施。对深基坑不安全或有安全隐患部位,应明视挂牌,提醒工人注意安全。
3.3施工质量与施工组织
1、围护结构的施工质量及土方开挖的合理组织也是开挖成败的关键之一。良好的施工质量和合理的施工组织可以弥补设计上的某些不足,反之,低劣的施工质量和错误的施工组织会使合理的设计付诸东流,在这方面有着许多深刻的教训。除施工质量外,施工组织也不可忽视,土方开挖前应制订。开挖方应严格按设计程序进行开挖,在开挖过程中应严格按“先撑后挖”的原则。工程实践证明,开挖顺序不同,支护结构的位移也不同,不合理的施工顺序会大大增加支护桩墙的位移,甚至出现险情。
2、此外,施工前要充分估计各种可能出现的情况,当出现险情时,准备可供选择的应急措施,以免险情出现时,措手不及,延误抢险时机,导致工程失败,造成严重损失。
3.4施工监测与信息化施工
1、支护结构设计成功与否,要通过施工实践来检验,而施工过程中支护结构的受力与变形状态要通过监测手段来了解。可以说,监测工作是支护结构安危状态的眼睛。它的重要性已为多数的设计、施工及建设单位所认识。因而投入一定的资金进行施工监测工作,取得了较好的效果,保证了施工安全。但也有部分建设单位对此重视不够,认为监测工作可有可无,不愿投入资金,马虎应付。有些监测单位素质不高,玩忽职守,不按时观测,不能提供准确的信息,以致在支护结构处于危险状态还未能提供预报,造成事故。一些深基坑支护工程发生坍塌事故,除施工质量的原因外,监测单位未能及时提出预警,以致延误抢险的时机,也是事故及发生的重要原因。
2、施工监测工作的有无及好坏,不单是影响到基坑自身的安全,更重要的是它还影响到基坑周围环境的安全。如邻近的房屋、道路、地下给排水、供气、通讯等设施的安全都依靠监测结果来维护。有些情况下,基坑开挖的失败对邻近环境造成的损害、经济损失及社会影响会比基坑工程本身更为严重。有时支护结
3、构的位移并未引起支护的失稳,但却引起周围建筑的不均匀沉降、裂缝及倾斜等,这些都需要由监测结果来判断与证实。施工监测的意义还不止于此,监测结果作为一种信息反馈还具有更重要的意义。它可以对设计结果进行检验,以致修改设计方案,施工前期的信息反馈可作为修改后期支撑方案的依据。例如,当前期开挖和第一道支撑后支护结构的位移较小,就可以考虑是否削减下一道支撑的数量以降低造价,反之,当前期开挖中支护结构的位移和内力比预计大得多,则应考虑是否加强下一道支撑以策安全。这就是动态设计及信息施工,是一种很有发展前
四、结语
综上所述,由于深基坑支护的特殊性,经济合理的设计方案往往直接影响深基坑支护工程施工键。而施工单位的整体素质、技术力量是设计方案能否落实的重要因素。因此,工程技术人员在施工前必须对方案进行认真审核,及时与设计人员沟通,充分理解设计意图。这样才能在施工时确保各个施工环节、各道施工工序协调有序。业主也要认真审查设计、施工单位,选择社会信誉好、技术力量强、施工经验丰富的专业队伍进行施工,确保工程安全。
关键词:建筑工程;深基坑支护;施工探讨
Abstract: With the development of high-rise building construction, in does not affect the construction method of adjacent buildings, deep foundation pit construction scheme has become the preferred. The support comprises construction project excavation, retaining, and waterproof enclosure of deep foundation pit, any intermediate process errors may lead to the construction accident, so it is a complicated system engineering. The author of this paper according to the construction work for many years, analyses the importance of building deep foundation pit supporting, and prevention of deep foundation pit support the information construction and construction of some unexpected events and emergency measures were described in detail.
Keywords: construction engineering; construction of deep foundation pit support;
中图分类号:TU74
一、深基坑工程的开挖
深基坑开挖施工前,施工单位应根据地质勘探的资料和水文气候情况,结合自身深基坑工程施工的经验和现场条件编制施工组织设计。施工组织设计的主要内容包括:基坑的支护、 基坑的开挖、施工平面布置图、降水措施、施工监测布置等。开挖要综合考虑开挖过程中基坑的受力特点,不能局部一次开挖到基底,使开挖区土体侧压力急剧释放,引起坑壁侧向位移。除此之外还要有专项施工方案和突发事件的应急预案。基坑的开挖施工是一个循序渐进的过程,应尽量做到一边施工一边监测,并遵循“分层开挖,先撑后挖,随挖随撑,对称均衡,限时限量”的施工原则,杜绝野蛮施工和盲目施工,并对施工过程加强控制,保证基坑支护安全顺利地完成。承担施工的单位要严格按照经过审批的施工组织设计及相关的施工规程和技术规范进行开挖,同时要加强施工过程中的监测。在土方开挖施工前要充分掌握工程所在地的地质勘测报告、周围建筑物和地下管线等设施的情况。对特殊土质更是要根据土质的不同进行施工组织设计,比如在膨胀土地区施工应避开雨季施工,在开挖过程中要充分关注膨胀土的特点,确保土体含水量的变化不大,从而使基坑支护尽可能受到土体膨胀压力的影响。在软土地区开挖时,分层深度不宜太大。这是因为如果挖土高差太大或挖土进度过快,就会打破土体原有的力学平衡,使其抗剪强度降低,使土体容易出现水平滑移,增大支护设施的额外压力,最终可能导致支护发生破坏而出现坑壁坍塌。
二、深基坑的止水
在地下水位较高的地区进行深基坑的开挖,地下水会对施工产生一定的危险。特别是在水源复杂地区,在制定止水方案时要充分掌握基坑周围环境地质水文资料,认真分析地下水的来源和成因。在大城市基坑周围建筑密集的情况下,切不可仅凭抽水降低地下水位。这样导致基坑周围土体排水固结引发的周围建筑物不均匀沉降的事故举不胜举。一旦出现这种灾难性的情况将大大增加处理难度。因此,止水要从防水、降水和排水三个方面进行综合考虑。深基坑的止水有许多方式,一般都是几种方法结合在一起。如有深层水泥搅拌桩连续墙、护壁桩水泥搅拌桩共同形成防渗墙、护壁桩高压旋喷桩组合防渗墙、地下连续墙、深基坑土钉與止水帷幕复合支护、单排桩结合止水帷幕、截水帷幕体系及复合支护等。止水帷幕是高地下水位地区深基坑支护施工中常用的一种止水措施,其施工方法主要是通过高压喷射把水泥浆和含有化学成分的浆液注入到地下,降低土体含水量,增强土体抗剪强度的目的。浆喷深层搅拌法和粉喷深层搅拌法通过搅拌把掺加剂(液)和高含水量的土体进行混合,从而达到降低土体含水量、增强土体强度的目的。在浆喷深层搅拌法和粉喷深层搅拌法施工中要特别注意搅拌桩的施工质量。通过合理计算确定水泥浆掺加量,一要保证桩体搅拌均匀;二要确保施工桩长达到设计深度后桩头部位还有浆,避免桩头处出现搅而无浆的情况。在土层情况变化较大的地区,施工要严格按设计进行,保证桩的搭接距离和桩身密实,杜绝空洞、蜂窝及桩头开叉的施工质量问题,避免出现因施工质量导致的止水失效。
三、深基坑施工的安全工作
3.1在技术方面应做的工作
1) 组成从项目经理到施工班组长的技术交底班子。充分认识深基坑支护设计与施工所要达到的目的和作用,并让每位参与者都熟悉施工的每一个环节,严格执行有关规范,做到监督和管理的作用,确保施工技术方案的实施。
2) 按图施工,动态监控。深基坑支护工程主要以挡土、防水等为主要目的,而设计的单一或复合挡土支护结构,有理论依据和可行性,必须尊重设计、按图施工,但施工中的不确定因素及设计所依据的资料有可能与实际情况不一致,要求在施工中必须依据实际的情况,相应作出一些调整,达到规范要求。
3.2在质安管理方面的工作
1、施工中应及时做好材料送检工作,所用材料必须有出厂合格、送检合格后方可使用,杜绝使用不合格材料。建立以人、物为中心的安全管理体系。建立以项目经理为核心的安全管理体系(从技术上、生产安全上) 选任得力、专业性强、安全意识强的人作安全员,并相应明确安全职责,签订安全合同书。做好安全教育
2、工作,牢固树立“安全第一、预防为主”的生产方针,做好“五同时”教育工作,将各项安全工作落实并强化到人,提高全员安全意识。制定并做好质量安全检查措施,列表列出常见施工事故和施工质量隐患或通病的出现部位,产生原因,预防和补救措施。对深基坑不安全或有安全隐患部位,应明视挂牌,提醒工人注意安全。
3.3施工质量与施工组织
1、围护结构的施工质量及土方开挖的合理组织也是开挖成败的关键之一。良好的施工质量和合理的施工组织可以弥补设计上的某些不足,反之,低劣的施工质量和错误的施工组织会使合理的设计付诸东流,在这方面有着许多深刻的教训。除施工质量外,施工组织也不可忽视,土方开挖前应制订。开挖方应严格按设计程序进行开挖,在开挖过程中应严格按“先撑后挖”的原则。工程实践证明,开挖顺序不同,支护结构的位移也不同,不合理的施工顺序会大大增加支护桩墙的位移,甚至出现险情。
2、此外,施工前要充分估计各种可能出现的情况,当出现险情时,准备可供选择的应急措施,以免险情出现时,措手不及,延误抢险时机,导致工程失败,造成严重损失。
3.4施工监测与信息化施工
1、支护结构设计成功与否,要通过施工实践来检验,而施工过程中支护结构的受力与变形状态要通过监测手段来了解。可以说,监测工作是支护结构安危状态的眼睛。它的重要性已为多数的设计、施工及建设单位所认识。因而投入一定的资金进行施工监测工作,取得了较好的效果,保证了施工安全。但也有部分建设单位对此重视不够,认为监测工作可有可无,不愿投入资金,马虎应付。有些监测单位素质不高,玩忽职守,不按时观测,不能提供准确的信息,以致在支护结构处于危险状态还未能提供预报,造成事故。一些深基坑支护工程发生坍塌事故,除施工质量的原因外,监测单位未能及时提出预警,以致延误抢险的时机,也是事故及发生的重要原因。
2、施工监测工作的有无及好坏,不单是影响到基坑自身的安全,更重要的是它还影响到基坑周围环境的安全。如邻近的房屋、道路、地下给排水、供气、通讯等设施的安全都依靠监测结果来维护。有些情况下,基坑开挖的失败对邻近环境造成的损害、经济损失及社会影响会比基坑工程本身更为严重。有时支护结
3、构的位移并未引起支护的失稳,但却引起周围建筑的不均匀沉降、裂缝及倾斜等,这些都需要由监测结果来判断与证实。施工监测的意义还不止于此,监测结果作为一种信息反馈还具有更重要的意义。它可以对设计结果进行检验,以致修改设计方案,施工前期的信息反馈可作为修改后期支撑方案的依据。例如,当前期开挖和第一道支撑后支护结构的位移较小,就可以考虑是否削减下一道支撑的数量以降低造价,反之,当前期开挖中支护结构的位移和内力比预计大得多,则应考虑是否加强下一道支撑以策安全。这就是动态设计及信息施工,是一种很有发展前
四、结语
综上所述,由于深基坑支护的特殊性,经济合理的设计方案往往直接影响深基坑支护工程施工键。而施工单位的整体素质、技术力量是设计方案能否落实的重要因素。因此,工程技术人员在施工前必须对方案进行认真审核,及时与设计人员沟通,充分理解设计意图。这样才能在施工时确保各个施工环节、各道施工工序协调有序。业主也要认真审查设计、施工单位,选择社会信誉好、技术力量强、施工经验丰富的专业队伍进行施工,确保工程安全。