在美国东南部爱达荷州曾在规划6900公顷灌溉工程时使用综合整数规划模型获得最小费用系统更新规划。考虑了三种自流型式的输送系统(现行的未衬砌渠道、混凝土衬砌渠道和自流管道)及五种型式的灌溉应用系统(二种自流和三种喷灌应用系统)。遵守规定约束的综合规划模型是灵活的和有效的,所谓规定约束是指水费和水土利用率。不同约束的定量效应容易求算。相同的模型程序也可供开发新的灌溉工程作最小费用系统规划方案选用。模型所给的描述性程序有助于规划人员、灌溉人员和其他有关人员在制定新建或改善灌溉工程的多目标规划中进行决策。
In the southeastern United States, Idaho used an integrated integer programming model to plan a minimum cost system update when planning a 6,900-hectare irrigation project. Three gravity-based delivery systems (existing unlined channels, concrete lining channels and gravity pipes) and five types of irrigation applications (two gravity and three sprinkler applications) were considered. The comprehensive planning model that complies with the stipulations is flexible and effective. The so-called stipulated constraints refer to water fee and water and soil utilization. The quantitative effect of different constraints easy to calculate. The same model program is also available for the development of a new irrigation project for minimum cost system planning options. Descriptive procedures provided by the model help planners, irrigation personnel and others concerned make decisions in multi-goal planning for new or improved irrigation projects.