论文部分内容阅读
经过各省、市、自治区和地(市)、县各级水利(水电)部门的共同努力,1986年各省、区、市小水电建设管理又有了新的发展(见年报)。近几年,小水电的建设遇到了一些暂时困难:一是劳动力工资提高,原来只给少量补助费,现在要按劳付酬,日工资高达4~5元;二是材料、设备价格上涨,钢材、水泥、木材没有纳入计划渠道,大多使用议价材料,价格高出一倍或更多。基于以上原因,小水电的单位千瓦造价提高了一倍或更多一些,从1000元左右提高到2000元以上。另一方面,银
Through the concerted efforts of provinces, municipalities, autonomous regions, and water conservancy (hydropower) departments at all levels in counties (cities) and counties, the development of small hydropower construction in provinces, districts, and cities has experienced new development in 1986 (see the annual report). In recent years, the construction of small hydropower has encountered some temporary difficulties: First, the wages of the labor force have been raised. In the past, only a small amount of subsidy has been paid. Now, the wages are paid according to labor. The daily wage is as high as 4 to 5 yuan. The second is the increase in the prices of materials and equipment. Steel, cement, and wood are not included in the planning channel. Most of them use bargaining materials, and the price is double or more. Based on the above reasons, the unit kilowatt cost for small hydropower has doubled or increased, from about 1,000 yuan to more than 2,000 yuan. On the other hand, silver