本文想通过某缺矿一、四矿体的地质勘探工作,谈谈在地质勘探工作中以及在总结报告编制过程中怎样才能使报告符合规范要求,满足矿山设计需要的几点体会.某铁矿一、四矿体是1962年进行补充勘探的,在这阶段,除利用了以往的钻探及部分地表施工成果之外,其他资料全部重新编制和测绘,就是钻探工程,也全部按规范进行重新编录.在这一时期,各项工作几乎是从头做起,质量要求高,工作量很大.因此,如何尽快地、保征质量地提出报告,供矿山生产设计使用,成了一个重要问题.由于党的正确领导,终于在野外施工停止后,及时提交了地质勘探总结报告书,并经储委审查批准,使矿山建设提前一年进行.现将我们的主要体会,叙述如下:
In this paper, I want to pass a geological survey of one or four ore bodies in a missing mine, and talk about how to meet the requirements of mine design in the geological exploration work and how to make the report complied with the requirements of the report. The first and the fourth ore bodies were complemented with exploration in 1962. During this stage, all the other materials were reorganized and surveyed in addition to the previous drilling and some surface construction results. They were all drilling works and all of them were re-recorded according to the specifications During this period, almost all work started from scratch with high quality and heavy workload, so how to report the quality as soon as possible and make it available to mine design and production has become an important issue. The correct leadership of the party has finally submitted the summary report of geological exploration after the construction in the open field has been stopped and has been examined and approved by the Reserve Committee of the People’s Republic of China so that the construction of the mine will be carried out one year in advance.We will now describe our main experience as follows: