珠海某超高层建筑抗拔桩设计

来源 :建材与装饰 | 被引量 : 0次 | 上传用户:snakegmj
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
珠海某超高层建筑有四层地下室,采用抗拔桩抵御水浮力,由于基坑支护采用内支撑的形式,承台以上有18m的空桩,桩身采用先预埋钢管,开挖土方破除空桩后伸入钢绞线,再对钢管进行注浆后张拉预应力钢绞线。桩身需满足承载力及裂缝的要求,以及按检测荷载进行复核;预应力锚头与钢管内注浆体之间需进行局压验算,钢管壁与注浆体间需进行摩擦力验算。 Zhuhai, a super high-rise building has four basements, the use of anti-pull pile to withstand buoyancy, due to the support of the foundation pit in the form of internal support, cap above the 18m empty piles, pile embedded steel pipe first, excavation of earth to get rid of After the empty pile into the strand, and then after the steel pipe grouting prestressed strand. Pile body to meet the requirements of bearing capacity and cracks, and according to the test load review; prestressed anchor head and pipe grouting between the need to check the pressure between the pipe wall and grouting need to check the friction between the body.
其他文献
近年来,钢结构工程主承建施工成本控制问题得到了业内的广泛关注,研究其相关课题有着重要意义.本文首先对相关内容做了概述,分析了钢结构工程主承建成本的全面控制,并结合相
为缓解空间不足和用地紧张现状,高层住宅建筑工程越来越多,同时随着社会对其质量和性能实际要求的提高,高层住宅建筑施工技术备受关注.但是,在科技水平快速发展的同时,也出现
在经济快速发展的推动下,城市现代化水平不断提高,人口不断增加,城市可用地面积的逐渐减少,建筑不断向高层发展。在本文中,笔者主要针对多层建筑桩基施工技术进行深入分析,以
随着经济的不断发展,我国很多地方都在大力发展城镇化建设。在此过程中,钢筋混凝土发挥了重要的作用。然而钢筋混凝土在施工的过程中,常常会因为各种原因而引起内部结构缺陷
地下连续墙施工是个复杂的施工过程,不仅对技术工人要求很高,而且也需要很好的技术储备.对于可能出现的质量问题,要有充分的认识,采取相应的预防和处理措施,然后总结经验,加
创新是21世纪社会发展的主导潮流.实施创新教育,培养高素质医学创新人才,是时代赋予高等医学教育的历史使命.本文着力分析了我国高等医学院校在创新教育方面存在的问题,如培
房建工程近年来得到了快速的发展,随着建筑数量的不断增加,建筑行业的问题也开始日益明显.随着我国城市化进程的不断推进,中国经济的飞速发展以及建筑施工技术水平的不断增强
建筑工程施工中,给排水管道渗漏问题一直都是比较常见且麻烦的问题.导致给排水管道渗漏的原因有许多,比如施工人员的技术水平不达标,施工材料的质量问题等都会直接导致给排水
随着我国社会的不断发展以及科学的不断进步,越来越多的全新科学技术以及新型材料已经应用在建筑工程的设计及施工过程中,这些都带来了建筑工程施工技术和施工工艺的巨大改变
随着建筑功能、规模的发展,结构设计面临着安全性的干扰,潜在很大的风险隐患.为了保障建筑工程的安全与稳定,需提高建筑结构设计的安全性,用于规范建筑施工,缓解建筑结构设计