从影响农村工程项目成本的3个重要因素——材料、工期、质量3个维度进行了分析,抓住各因素主要控制点,结合原始成本控制手段,建立了适合工程项目的成本控制体系。
From the three dimensions of material cost, duration and quality, three major factors affecting the cost of rural engineering are analyzed, and the main control points of each factor are grasped. Based on the original cost control method, a cost control system suitable for the project is established.