主要对地下公共车行通道与目前上部在建道路6处交叉部位从建设条件、周围环境、工程地质条件、结构设计方案、工期、工程投资等方面进行分析论证,提出可行的设计方案,达到“结构安全可靠、满足使用功能、经济合理可控、工程实施可行”的总体要求。
Mainly on the underground bus routes and the current construction of the cross at the top of the road 6 from the construction conditions, the surrounding environment, engineering geological conditions, structural design, construction period, project investment and other aspects of analysis and demonstration, put forward feasible design options to achieve “The structure is safe and reliable, meet the use of functional, economical and reasonable controllable, project implementation feasible” overall requirements.