论文部分内容阅读
铁路第六次大提速,首次在既有提速干线开行时速200公里动车组以及时速120公里、载重5000吨货运重载列车。铁道部要求,在搞好提速工程基础改造的同时,加快线路平面改造工程建设,如期完成京沪、浙赣电气化改造。有关部门要全力做好时速200公里动车组和大功率机车运行试验,加快时
The sixth major speed increase of the railway, for the first time in the existing speed railway line opened 200 kilometers per hour EMU and 120 kilometers per hour, carrying 5,000 tons of cargo overloaded trains. The Ministry of Railways required that while doing a good job of speeding up the basic reconstruction of the project, speeding up the construction of the plane renovation project and completing the electrification of Beijing, Shanghai, Zhejiang, and Jiangxi as scheduled. Relevant departments should make every effort to run the 200km / h EMU running test and accelerate