论文部分内容阅读
河北省某县,有一座30米高的烈士塔。烈士塔后面是一片洼地,下面集了很多水,雨水浸入地基,使塔产生了不均匀的下沉,塔尖向后倾斜了20多厘米。怎么办呢?大家议论纷纷,有的说拆去重建,有的说设法加固处理,争论不休。这时有一位农民说:“我看,塔歪了是水泡的, 咱们还用水泡正,不行吗?”大家一听,都觉得既有道理,又简便易行。于是就在塔的前面挖了一道垄沟,放进水,使塔的前面也受水浸,果然达到了均匀下沉的效果,塔身又正了。在工程界也有利用钻孔注水来矫正水塔、烟囱、建筑物等事例,只不过
In a county in Hebei Province, there is a 30-meter-high martyr tower. Behind the martyrs tower is a depression, below a lot of water, rain immersed in the foundation, so that the tower has a non-uniform sinking, tilted back more than 20 cm. What should we do? Everyone has talked about it, some have said that they have been demolished and rebuilt, and some have said that they have tried to reinforce it and argue endlessly. At this time, one farmer said: “I think the tower was blistering. We still use water to make it. Is it okay?” “Everyone felt it was reasonable and easy to do.” So he dug a ditch in front of the tower and put it in the water so that the front of the tower was also flooded. The result was a uniform sinking effect and the tower was in full swing. In the engineering community, borehole water injection is used to correct water towers, chimneys, and buildings.