施工升降机装配调试过程中经常出现吊笼和传动板无法直接装配,目前国内生产厂家通常采用“烧耳朵”方法来实现两者的装配组合。但采用该方法,存在厂内装配调试效率极其低下,施工升降机产品质量也难以保证等问题。本文引入装配互换性概念,介绍一种新方法,并使其在施工升降机装配调试中得以合理应用,彻底避免了因采用“烧耳朵”方法来实现吊笼和传动板的装配时伴随的诸多问题,大大提高了产品的市场竞争力。
Construction hoist assembly and commissioning process often appear hanging cage and drive plate can not be directly assembled, the current domestic manufacturers usually use “burning ears ” method to achieve the assembly of the two. However, with this method, there is a problem that the efficiency of factory assembly and commissioning is extremely low and the quality of construction elevator products is difficult to guarantee. This paper introduces the concept of assembly interchangeability, introduces a new method, and makes it reasonable application in the construction elevator assembly debugging, completely avoids the use of “burning ears ” method to achieve the cage and the drive plate assembly with Many problems, greatly enhance the product’s market competitiveness.