针对彬长矿区胡家河矿井全基岩、井筒直径大、井壁受力复杂的特点,介绍了C70高性能混凝土原材料选择、配合比设计、计量、拌合、运输、浇筑、养护等过程的质量控制,从混凝土配合比入手研究混凝土的工作特性,经过试验段的进一步验证,优化C70高性能混凝土的工作性能、降低水化热、防止裂缝发生、提高耐久性及力学性能使混凝土的和易性、坍落度、流动性满足岩石地下工程的施工现场条件,对于C70混凝土的浇筑,除在施工工艺进行精心组织外,实现人们对地下工程被复混凝土结构“内实外美”的质量要求。降低井壁厚度,提高井壁混凝土的耐久性。
In view of the characteristics of Hujiahe mine’s entire bedrock, large borehole diameter and complicated borehole stress in Binchang Mine, the quality control of C70 high performance concrete raw material selection, mix design, metering, mixing, transportation, pouring and curing is introduced , From the concrete mixture ratio to study the working characteristics of concrete, after further validation of the test section, to optimize the performance of C70 high performance concrete, reduce hydration heat, to prevent cracks, improve durability and mechanical properties make the workability of concrete, Slump, fluidity to meet the rock underground construction site conditions for the C70 concrete pouring, except in the construction process carefully organized, to achieve people’s underground works are complex concrete structure “inside and outside the United States ” quality requirements . Reduce the wall thickness, improve the durability of concrete lining.