宁夏水利厅东干渠山水沟渡槽翻建工程于2008年9月开工建设,2009年4月完工。渡槽槽身采用预应力结构,两侧墙吊装就位后再进行槽底混凝土浇筑,原设计方案采用满堂脚手架作底部支撑,项目部根据现场施工情况改进施工措施,改用悬挂支撑,达到预期效果,节省了施工成本。
Ningxia Water Conservancy Hall East Canal Shantou aqueduct rebuilding project started construction in September 2008, completed in April 2009. Aqueduct body using prestressed structure, the two sides of the wall after the lifting of the concrete pouring tank floor, the original design using full scaffolding at the bottom of the support, the project department to improve construction practices based on site construction, use suspension support, to achieve the desired results , Saving construction costs.