本文就云浮硫铁矿总体设计中的具体工程(如:采矿工程、原矿运输、富矿棒磨工艺系统、矿区泥石流治理工程、场地稳定工程、边坡治理工程、转载矿仓工程、矿区环境设计及外部运输工程等),介绍了其一套完整的设计总体构思,诸如总体布局、破碎站及选厂位置选择、节约用地、选用先进设备和技术、重视矿区各种自然条件、注意环境保护、重视与地力的协作条件、外运方案的考虑等,是保证工程设计质量的关键。
In this paper, the overall design of Yunfu pyrite in the specific project (such as: mining engineering, ore transportation, rich ore rod mill system, mining debris flow control project, site stability engineering, slope treatment project, repossession ore project, mine environmental design and External transport engineering, etc.), introduced a complete set of overall design concept, such as overall layout, site selection of crushing plant and processing plant, land conservation, selection of advanced equipment and technology, emphasis on various natural conditions in mining area, attention to environmental protection, emphasis Collaboration with the conditions of the ground, the Sinotrans program to consider, etc., is to ensure the quality of engineering design key.