利比亚住宅小区外线设计包括三部分内容:电力、通信和路灯照明。电力变压器容量的选择与通常的计算方法有很大不同,居住区外线设计各专业人员之间的互相配合是很重要的。利比亚班加西“绿色家园”1#地块项目为5000套住宅及配套设施的中小学、医院、商业和文体等建筑用房的工程。本规划区总用电负荷估算约为86万kW,在“绿色家园”西南角设置一座220/66kV变电站,四座66/11kV中压变电站,接至该园区内不同容量的变压器共有91台。
Libya residential district outside design includes three parts: electricity, communications and street lighting. Power transformer capacity selection and the usual method of calculation is very different, living outside the design of the interaction between the professionals is very important. Libya Benghazi “green home ” 1 # land parcel project for 5000 sets of residential and ancillary facilities in primary and secondary schools, hospitals, commercial and cultural buildings and other construction projects. The total planned electricity load in the planning area is estimated to be about 860,000 kW. A 220 / 66kV substation and four 66 / 11kV medium voltage substations will be set up in the southwest corner of the “Green Garden”. There will be 91 sets of transformers with different capacities connected to the park .