○甘肃国营五○四厂近年来用水量增大,需敷设第三条直流水管道。由于有一段施工区地下有电缆、管道等26条,地上有铁路、公路13条,错综复杂。设计部门因详细情况不清,初步设计将直流水管绕道避开复杂地区,全长为1400米。在设计复审时,厂档案科及时提供了该地区全套施工、竣工档案84卷,使设计部门掌握了准确数据,弄清了情况,大胆修改了原设计方案,使直流水管顺利地通过了这一复杂地区,并比原设计缩短了490多米,节省了人力,缩短了工期,仅节约原材料费就达22.4万余元。
○ Gansu State-owned State-owned Factory No. 504 Plant has seen an increase in water consumption in recent years and a third direct-current water pipeline needs to be laid. As there is a section of the construction area underground with cables, pipes and other 26, there are railway, highway 13, complex. Due to unclear details of the design department, the preliminary design of the bypass will bypass the DC complex areas, a total length of 1400 meters. During the design review, the factory archives division timely provided a complete set of construction and completion files 84 volumes in the area, which enabled the design department to grasp the accurate data, clarified the situation and boldly revised the original design proposal so that the straight water pipe passed this Complicated areas, and shortened more than 490 meters than the original design, saving manpower and shortening the construction period, saving only about 224,000 yuan of raw materials costs.