软土路基关键技术问题试验项目是我国第一个按照高时速客运专线技术标准建设的综合试验项目。本文详细介绍了试验项目技术工作路线,包括项目策划、项目实施、研究分析三阶段;项目管理体系分为质量管理、安全管理、进度管理、成本控制及资金管理等四个方面;以及试验项目主要研究成果,涵盖勘察、设计、施工、质量控制及效果评估等各环节。文章通过对以上内容的总结与深化,以期为我国铁路客运专线建设和其他大型科研试验项目提供参考。
Soft soil subgrade test of key technical issues is the first in accordance with the high-speed passenger dedicated technical standards for the construction of a comprehensive pilot project. This paper introduces in detail the technical work route of the pilot project, including three phases: project planning, project implementation and research analysis. The project management system is divided into four aspects: quality management, safety management, schedule management, cost control and fund management. The research results cover various aspects of survey, design, construction, quality control and effectiveness evaluation. Through summarizing and deepening the above contents, the article hopes to provide a reference for the construction of China’s railway passenger dedicated line and other large-scale scientific research pilot projects.