1991年第6期《公路》.刊登了李大明工程师介绍的日本大跨径桥梁深水基础施工方法一文,读后启发很大.深感我国公路建桥技术、施工设备、工程材料等方面还有较大差距.更确切地说,还有很大差距,特别是在大江大河上修建公路桥梁,遇到的基础设计和施工问题更为突出.大跨深水基础的形式,很大程度上决定于水文、地质和施工条件.大江大河一般水深流急,水位涨落季节性很强,施工难度很大.如何以最快的速度,在一个施工季节,完成墩身出水,将影响整个工程进度和造价,甚至工程的安危.因此,基础设计构思、施工设备、施工工艺应有周密计划,甚至还应有应急措施,以防万一.
1991 No. 6 “Highway.” Published by Li Daming engineers introduced the Japanese long-span bridge deep-water foundation construction method, read great inspiration .Due to our country highway bridge construction technology, construction equipment, engineering materials, etc. A large gap, to be precise, there is still a long way to go.Especially in the construction of highways and bridges on major rivers, the problems of basic design and construction are more conspicuous.The form of long-span deepwater foundation depends largely on Hydrology, Geology and Construction Conditions. The general situation of major rivers is very acute and the seasonal fluctuation of water level is very strong, so it is very difficult to construct. How to finish the piers water discharge in one construction season with the fastest speed will affect the whole project progress and Cost, and even the safety of the project Therefore, the basic design concept, construction equipment, construction technology should be well-planned, and even emergency measures should be in case.