本文作者认为,采取以下措施能降低矿山基建工程量:保持充分的生产力后备,最大限度地利用提升设备,并对主井和副井作出明确分工;改用集中水平层和中间水平层开拓和准备各阶段;增加阶段高度,并使用电梯运送材料和设备;广泛采用自中间水平层把矿石转运到集中水平层的方法;井下机械破碎由井旁移到采掘地区直接进行,并使井下运输最大限度地使用皮带运转机。
The author believes that the following measures can be taken to reduce the amount of mine infrastructure construction: to maintain a full reserve of productive forces, to maximize the use of lifting equipment and make a clear division of labor between the main shaft and the auxiliary shaft; to switch to the horizontal and intermediate levels of horizontal and horizontal development and preparation Various stages; increasing the stage height and using elevators to transport materials and equipment; extensive use of a method of transferring ore from the intermediate level to a centralized level; mechanical downhole drilling directly from the side of the well to the mining area and directing downhole transportation to the maximum Use the belt running machine.