论文部分内容阅读
天津站后广场公文客运枢纽站上程是利用世界银行贷款项目,经市质量监督总站核验一次通过,且达到国家质量验评优良标准,成为优良工程。 该工程是天津市政府成功地利用了世行贷款结合城市总体规划,改造老城区,改善本地区居民的居住条件,同时加强了城市基础设施建设,一定程度上缓解了城市居民乘车难。也是1995年市政府为全市人民办的二十
Tianjin Shanghou Square Gongwen Passenger Hub Station Shangcheng is using the World Bank loan project, passed the verification of the Municipal Quality Supervision Station, and it has passed the excellent standards of national quality assessment and become an excellent project. This project is the successful use of the World Bank loan by the Tianjin municipal government in conjunction with the city’s overall plan to transform the old city, improve the living conditions of residents in the area, and at the same time strengthen the construction of urban infrastructure, to a certain extent ease the difficulty of urban residents. It is also the twenty-fifth of the city government in 1995 for the people of the city.