摘要:建筑工程是一项庞大的综合性工程,而工程的施工管理又具有高度的复杂性,要搞好这项工作,就必须要根据建筑施工企业自身的一些特点,通过实施科学的方法和技术手段,提高工程施工管理水平。合理建立施工管理机构,制定各项施工管理的规章制度,形成合理的施工管理长效的管理机制。这样,建筑工程施工管理水平才会上一个新的台阶,才能真正实现规范化、标准化和科学化。
关键词:建筑工程;施工管理;建议
Abstract: The construction project is a large comprehensive project, and also has a high degree of complexity of the construction project management, to do a good job in this work, we must according to the construction enterprises to its own characteristics, through the implementation of methods and technology, improve the construction management level. To establish a reasonable construction management mechanism, establishing the construction management regulations, the construction management of long-term management mechanism. So, building engineering construction management will be a new level, can we truly achieve the standardization, standardization and scientific.
Key words: construction engineering; construction management; suggestions
中图分类号:TU71
0 引言
随着经济的快速发展,我国的建筑市场呈现一片繁荣的景象,同时,建筑施工企业间的竞争也变得激烈起来。对于建筑施工企业来说,工程施工质量的提高,施工成本的有效控制,对建筑施工企业提高市场竞争力有着非常重要的作用。工程施工过程质量的管理,是质量控制体系的根本,是实施保障施工质量的核心,要保障工程施工质量符合标准,就必须要通过科学的施工过程管理。同时,有效的工程施工管理,也是一个企业成本管理的基础。所以,强化建筑工程施工管理,对于目前我国建筑工程施工企业来说,是必须要完成的首要任务。
1 建筑工程施工管理的现状
1.1管理模式现状
我国建筑工程项目管理的突出现状之一是管理模式不合理。我国建筑工程的管理模式仍然带有很强的计划经济色彩,以行政和硬性指令来代替科学的管理方法,这一点在国内大型企业体现的尤为明显。
工期制定方面,表现为对总体规划方面不够重视,所做的各种计划不科学、不符合实际、主要靠以往积累的经验,拍脑袋定工期。如果遇到新的结构形势的项目则更是一筹莫展,只能主观臆断,制定措施不得当。
控制方面,表现为在企业内部对控制缺乏足够的重视,缺少完整的控制体系,主要凭经验积累和主观臆想。控制的大部分内容被检查工作所代替了。检查只有等待任务结束以后才能进行,也就是说进行的只是事后控制。对检查出现问题的结果,不进行统计分析和量化计算,只是定性作出判断。事前控制和事中控制没有得到足够的重视。
材料采购方面,目前建筑企业的采购方式多采用大批量集中采购的方式。项目接到手现联系供货商,与供货商缺乏一种长期稳定的合作关系。采购方式缺乏灵活性,大宗材料一次购入量太大,既占用资金又占用场地,零星材料又得频繁采购,增加了采购成本。
1.2人员素质现状
我国的建筑企业队伍素质整体较低,并且结构层次也不尽合理。首先,高等教育以上学历人员不多,而大、中专学历者占据绝大多数;其次,存在着重工程技术人员,轻管理专业人员的倾向,在缺少高素质的工程技术人员的同时,合格的项目经理等企业经营管理方面的人员更为缺少。
特别是目前对我国来说,建筑业是一支劳动密集型的行业,一线的操作工人技能水平较低,特别是农民工的素质急待提高,这已成为工程质量上不去的一个主要因素。因为建筑工程的现场施工任务主要由农工承担,其中相当一部分人是刚刚放下锄头就上了工地的农民,文化程度很低,并且其中的大部分人员未经任何培训。这不仅影响到工程质量,而且容易出现安全事故。
2 抓好施工管理的建议
2.1 加强工程项目施工质量管理 加强施工质量管理,建立合理可行的质量保证体系,将工程的质量工作落到实处。工程施工企业要根据质量保证体系,形成行之有效的质量保证系统,树立质量方针,从而让其更加有指令性、系统性及可操作性。要将人、材料和机械各个要素有效结合起来。首先,人是质量控制的核心,要把人作为控制的推动力,充分调动人的积极性,树立工程质量第一的观念。其次,施工材料作为建筑产品的主体,对材料质量的控制是工程质量控制的关键。最后,工程施工的机械是进行施工机械化的主要标志,对现代化项目施工起到不可缺少的作用,它直接影响了施工项目的进度和质量,所以,选好用好工程机械设备非常重要。所以,应该根据工程项目的具体特点,综合考虑各种环境因素,实施有效的施工现场控制,為保证施工质量及安全创造良好的外部条件。
2.2加强核算意识,提高施工成本管理水平 在建筑工程施工过程中,施工企业应当强化材料购买、人工成本及项目预算等诸多环节的管理工作,从而将项目成本的预测和控制落到实处,克服项目管理体制中“包盈不包亏”的问题。要加强企业定额的管理,实现用定额来进行编制计划和组织生产,使用定额进行核算,以此来有效地提高经济效益。另外,还要切实落实和贯彻《企业财务通则》及《企业会计准则》等财务制度,加强财务审计监督,减少不合理的开支,缩减管理费用,提高资金的使用效率;拟订企业内部相关财务管理制度,杜绝账物不符合、成本不实在、盈亏不一致等问题。
2.3 加强施工项目安全生产和文明施工的管理 工程施工项目的安全管理,即是工程施工项目在进行过程当中,实施安全生产的所有活动,依据对生产要素的详细控制,消除一些不安全的生产行为,因而保证施工项目的正常实施,不发生安全生产事故。实行安全管理原则,就要坚持安全和生产并行,安全和生产必须同时抓,确保生产的安全,从而保证生产的正常进行。
2.4 讲诚信,守信用,强化合同管理 企业要想更好地面向市场,就必须严格遵守工程承包合同,在工期内保质保量地完成,同时要提供良好的售后服务,这样才能提高企业的知名度,增强企业的竞争力。要提高企业拟制合同的水平,保证合同的完整性与合理性;项目的管理目标,就是要以工程项目合同细则所明确的工期和质量为准,合理有效地组织施工生产;总承包商应和各分包商签订相应的合同,对合同双方进行一定的制约,分包商向总承包商负责,总承包商向总工程负责。
2.5 加强工程施工现场的管理 施工现场的管理水平是一个企业施工管理水平的切实反映,因而必须要依靠严格的岗位责任及完善的规章制度来对现场施工人员进行管理,制定严明的工作纪律,杜绝管理上的漏洞。要改进施工工艺,提高施工水平,改善施工现场的作业环境。施工企业对现场的管理一定要从文明施工做起,保持现场的施工秩序井然有序,使施工现场管理做到环境整洁,管理有序,工具完好,促使现场管理水平上一个新的水平。
2.6 采用信息化管理系统,促进工程施工高效管理 采用信息化管理系统,促进施工管理的自动化,对于提高施工质量的管理有极大的作用。在工程施工管理中采用信息化管理系统时,要与工程建设企业的特点相结合起来,要能够有的放矢。工程主管人员要重视信息化管理系统的重要性。信息化管理系统的最大优点,是能够提供企业施工管理所要的各种信息,为管理人员组织生产提供辅助决策手段。有了信息化的管理系统,就可以及时地了解工程进展情况,有助于对工程项目的质量及成本进行分析和控制。
3如何做好建筑工程施工管理创新工作
3.1要把选准项目经理,建好项目管理层。作为加强工程项目管理的“龙头”
首先,要实行项目经理职业化管理。项目经理应从受过正规培训、具有项目经理资格证书的人员中选拔。要制定项目经理任用制度,健全项目经理管理制度,明确项目经理的责、权、利、险,遏制不良现象。
同时要加强项目经理后备人选的培养和作风建没,让他们有机会在项目经理、项目副经理、项目经理助理或见习项目经理岗位上锻炼。并不断提高其思想政治水平和职业道德水平,提高业务素质。
其次,要坚持精干高效,结构合理、”一岗多责、一专多能”的原则,做到对项目机构的设置和人员编制弹性化,对项目部管理层人员要根据项目的不同特点和不同阶段的要求。在各项目之间合理组合和有效流动.实行派遣与聘用相结合的机制,根据项目大小和管理人员性格、特长、管理技能等因素合理组合。防止项目经理自由组阁.形成独立“王国” 保证项融部管理层整体合作的有效发挥。
3.2要把项目评估、合同签订。作为加强工程项目管理的基础
当前不少施工企业对项目评估、测算的地位和作用认识不足:有的评估、测算的权限不明确,方法不科学;有的评估、测算滞后,激励、约束不到位,缺乏动态跟踪考核,造成项目管理失控,项目盈亏到竣工时算总帐。
为解决好这个问题,笔者认为,必须抓好四个方面的工作:一是要提高认识。在思想上切实把项目评估、测算作为加强项目管理的基础,堵塞效益流失的第一道关口来认识。自觉地搞好评估和测算。二要加强评估、测算的组织领导,要成立专门的领导小组,有专人负责.有科学的评估、测算指标体系。 三要依法签订承包经营合同,上缴风险保证会、委派主办会计。四要认真进行项目运行中的监督、检查、指导和考核。帮助项目经理及时纠正经营管理偏差,确保项目目标实现。
3.3要把深化责任成本管理。作为加强工程项目管理的“核心”
3.3.1建立继全项目责任成本集约化管理体系 体系应包括责任、策划、控制、核算和分析评价五方面内容。一要明确成本费用发生的项目部门、分队(班组)和岗位应负的成本效益责任,使成本与经济活动紧密挂钩;二要分时段对成本发生进行预测、决策、计划、预算等方面的策划。制定成本费用管理标准;三要综合运用强制或弹性纠偏手段.围绕增效及时发现和解决偏离管理标准的问题;四要认真加工和处理成本会计信息,以期改善管理、降本增效;在要按期进行成本偏差和效益责任的分析评价,严格业绩考核和奖惩兑现。
3.3.2堵住“四个漏涧”,实行“六项制度” 即:堵住工程分包、材料采供、设备购管和非生产性开支等效益流失渠道。实行工程二次预算分割制、材料采供质价对比招标制、购置设备开支计划审批制、管理费用开支定额制、主办会汁委派制和项日经理对资金回收清欠终身负责制,杜绝项目资金沉淀和挪用。
3.3.3切實转变观念,强化成本意识一是要树立“企业管理以项目管理为中心,项目管理以成本管理为中心”的经营理念;二是要树立集约经营,精耕细作和挖潜增效的观念;三是要树立责任、成本、效益意识,营造企业整体重视.项目部全员参与,施工生产全过程控制成本费用的良好氛围。
4 结束语
综上所述,工程施工管理是提高企业市场竞争力、实施成本管理的一个有效手段,提高企业的工程施工管理水平,对企业的发展有着非常重要的作用。本文对当前我国建筑工程施工管理的现状进行了分析,针对当前的一些不足,提出了一些促进提高工程施工管理水平的建议和措施。
参考文献:
1 刘晓龙.建筑工程施工管理及对策[J].神州.2012(12)
2 刘尚青.建筑工程施工管理探讨[J].中华建设.2013(03)
3 杨震寰.浅谈建筑工程施工管理的优化[J].科技广场.2012(10)
关键词:建筑工程;施工管理;建议
Abstract: The construction project is a large comprehensive project, and also has a high degree of complexity of the construction project management, to do a good job in this work, we must according to the construction enterprises to its own characteristics, through the implementation of methods and technology, improve the construction management level. To establish a reasonable construction management mechanism, establishing the construction management regulations, the construction management of long-term management mechanism. So, building engineering construction management will be a new level, can we truly achieve the standardization, standardization and scientific.
Key words: construction engineering; construction management; suggestions
中图分类号:TU71
0 引言
随着经济的快速发展,我国的建筑市场呈现一片繁荣的景象,同时,建筑施工企业间的竞争也变得激烈起来。对于建筑施工企业来说,工程施工质量的提高,施工成本的有效控制,对建筑施工企业提高市场竞争力有着非常重要的作用。工程施工过程质量的管理,是质量控制体系的根本,是实施保障施工质量的核心,要保障工程施工质量符合标准,就必须要通过科学的施工过程管理。同时,有效的工程施工管理,也是一个企业成本管理的基础。所以,强化建筑工程施工管理,对于目前我国建筑工程施工企业来说,是必须要完成的首要任务。
1 建筑工程施工管理的现状
1.1管理模式现状
我国建筑工程项目管理的突出现状之一是管理模式不合理。我国建筑工程的管理模式仍然带有很强的计划经济色彩,以行政和硬性指令来代替科学的管理方法,这一点在国内大型企业体现的尤为明显。
工期制定方面,表现为对总体规划方面不够重视,所做的各种计划不科学、不符合实际、主要靠以往积累的经验,拍脑袋定工期。如果遇到新的结构形势的项目则更是一筹莫展,只能主观臆断,制定措施不得当。
控制方面,表现为在企业内部对控制缺乏足够的重视,缺少完整的控制体系,主要凭经验积累和主观臆想。控制的大部分内容被检查工作所代替了。检查只有等待任务结束以后才能进行,也就是说进行的只是事后控制。对检查出现问题的结果,不进行统计分析和量化计算,只是定性作出判断。事前控制和事中控制没有得到足够的重视。
材料采购方面,目前建筑企业的采购方式多采用大批量集中采购的方式。项目接到手现联系供货商,与供货商缺乏一种长期稳定的合作关系。采购方式缺乏灵活性,大宗材料一次购入量太大,既占用资金又占用场地,零星材料又得频繁采购,增加了采购成本。
1.2人员素质现状
我国的建筑企业队伍素质整体较低,并且结构层次也不尽合理。首先,高等教育以上学历人员不多,而大、中专学历者占据绝大多数;其次,存在着重工程技术人员,轻管理专业人员的倾向,在缺少高素质的工程技术人员的同时,合格的项目经理等企业经营管理方面的人员更为缺少。
特别是目前对我国来说,建筑业是一支劳动密集型的行业,一线的操作工人技能水平较低,特别是农民工的素质急待提高,这已成为工程质量上不去的一个主要因素。因为建筑工程的现场施工任务主要由农工承担,其中相当一部分人是刚刚放下锄头就上了工地的农民,文化程度很低,并且其中的大部分人员未经任何培训。这不仅影响到工程质量,而且容易出现安全事故。
2 抓好施工管理的建议
2.1 加强工程项目施工质量管理 加强施工质量管理,建立合理可行的质量保证体系,将工程的质量工作落到实处。工程施工企业要根据质量保证体系,形成行之有效的质量保证系统,树立质量方针,从而让其更加有指令性、系统性及可操作性。要将人、材料和机械各个要素有效结合起来。首先,人是质量控制的核心,要把人作为控制的推动力,充分调动人的积极性,树立工程质量第一的观念。其次,施工材料作为建筑产品的主体,对材料质量的控制是工程质量控制的关键。最后,工程施工的机械是进行施工机械化的主要标志,对现代化项目施工起到不可缺少的作用,它直接影响了施工项目的进度和质量,所以,选好用好工程机械设备非常重要。所以,应该根据工程项目的具体特点,综合考虑各种环境因素,实施有效的施工现场控制,為保证施工质量及安全创造良好的外部条件。
2.2加强核算意识,提高施工成本管理水平 在建筑工程施工过程中,施工企业应当强化材料购买、人工成本及项目预算等诸多环节的管理工作,从而将项目成本的预测和控制落到实处,克服项目管理体制中“包盈不包亏”的问题。要加强企业定额的管理,实现用定额来进行编制计划和组织生产,使用定额进行核算,以此来有效地提高经济效益。另外,还要切实落实和贯彻《企业财务通则》及《企业会计准则》等财务制度,加强财务审计监督,减少不合理的开支,缩减管理费用,提高资金的使用效率;拟订企业内部相关财务管理制度,杜绝账物不符合、成本不实在、盈亏不一致等问题。
2.3 加强施工项目安全生产和文明施工的管理 工程施工项目的安全管理,即是工程施工项目在进行过程当中,实施安全生产的所有活动,依据对生产要素的详细控制,消除一些不安全的生产行为,因而保证施工项目的正常实施,不发生安全生产事故。实行安全管理原则,就要坚持安全和生产并行,安全和生产必须同时抓,确保生产的安全,从而保证生产的正常进行。
2.4 讲诚信,守信用,强化合同管理 企业要想更好地面向市场,就必须严格遵守工程承包合同,在工期内保质保量地完成,同时要提供良好的售后服务,这样才能提高企业的知名度,增强企业的竞争力。要提高企业拟制合同的水平,保证合同的完整性与合理性;项目的管理目标,就是要以工程项目合同细则所明确的工期和质量为准,合理有效地组织施工生产;总承包商应和各分包商签订相应的合同,对合同双方进行一定的制约,分包商向总承包商负责,总承包商向总工程负责。
2.5 加强工程施工现场的管理 施工现场的管理水平是一个企业施工管理水平的切实反映,因而必须要依靠严格的岗位责任及完善的规章制度来对现场施工人员进行管理,制定严明的工作纪律,杜绝管理上的漏洞。要改进施工工艺,提高施工水平,改善施工现场的作业环境。施工企业对现场的管理一定要从文明施工做起,保持现场的施工秩序井然有序,使施工现场管理做到环境整洁,管理有序,工具完好,促使现场管理水平上一个新的水平。
2.6 采用信息化管理系统,促进工程施工高效管理 采用信息化管理系统,促进施工管理的自动化,对于提高施工质量的管理有极大的作用。在工程施工管理中采用信息化管理系统时,要与工程建设企业的特点相结合起来,要能够有的放矢。工程主管人员要重视信息化管理系统的重要性。信息化管理系统的最大优点,是能够提供企业施工管理所要的各种信息,为管理人员组织生产提供辅助决策手段。有了信息化的管理系统,就可以及时地了解工程进展情况,有助于对工程项目的质量及成本进行分析和控制。
3如何做好建筑工程施工管理创新工作
3.1要把选准项目经理,建好项目管理层。作为加强工程项目管理的“龙头”
首先,要实行项目经理职业化管理。项目经理应从受过正规培训、具有项目经理资格证书的人员中选拔。要制定项目经理任用制度,健全项目经理管理制度,明确项目经理的责、权、利、险,遏制不良现象。
同时要加强项目经理后备人选的培养和作风建没,让他们有机会在项目经理、项目副经理、项目经理助理或见习项目经理岗位上锻炼。并不断提高其思想政治水平和职业道德水平,提高业务素质。
其次,要坚持精干高效,结构合理、”一岗多责、一专多能”的原则,做到对项目机构的设置和人员编制弹性化,对项目部管理层人员要根据项目的不同特点和不同阶段的要求。在各项目之间合理组合和有效流动.实行派遣与聘用相结合的机制,根据项目大小和管理人员性格、特长、管理技能等因素合理组合。防止项目经理自由组阁.形成独立“王国” 保证项融部管理层整体合作的有效发挥。
3.2要把项目评估、合同签订。作为加强工程项目管理的基础
当前不少施工企业对项目评估、测算的地位和作用认识不足:有的评估、测算的权限不明确,方法不科学;有的评估、测算滞后,激励、约束不到位,缺乏动态跟踪考核,造成项目管理失控,项目盈亏到竣工时算总帐。
为解决好这个问题,笔者认为,必须抓好四个方面的工作:一是要提高认识。在思想上切实把项目评估、测算作为加强项目管理的基础,堵塞效益流失的第一道关口来认识。自觉地搞好评估和测算。二要加强评估、测算的组织领导,要成立专门的领导小组,有专人负责.有科学的评估、测算指标体系。 三要依法签订承包经营合同,上缴风险保证会、委派主办会计。四要认真进行项目运行中的监督、检查、指导和考核。帮助项目经理及时纠正经营管理偏差,确保项目目标实现。
3.3要把深化责任成本管理。作为加强工程项目管理的“核心”
3.3.1建立继全项目责任成本集约化管理体系 体系应包括责任、策划、控制、核算和分析评价五方面内容。一要明确成本费用发生的项目部门、分队(班组)和岗位应负的成本效益责任,使成本与经济活动紧密挂钩;二要分时段对成本发生进行预测、决策、计划、预算等方面的策划。制定成本费用管理标准;三要综合运用强制或弹性纠偏手段.围绕增效及时发现和解决偏离管理标准的问题;四要认真加工和处理成本会计信息,以期改善管理、降本增效;在要按期进行成本偏差和效益责任的分析评价,严格业绩考核和奖惩兑现。
3.3.2堵住“四个漏涧”,实行“六项制度” 即:堵住工程分包、材料采供、设备购管和非生产性开支等效益流失渠道。实行工程二次预算分割制、材料采供质价对比招标制、购置设备开支计划审批制、管理费用开支定额制、主办会汁委派制和项日经理对资金回收清欠终身负责制,杜绝项目资金沉淀和挪用。
3.3.3切實转变观念,强化成本意识一是要树立“企业管理以项目管理为中心,项目管理以成本管理为中心”的经营理念;二是要树立集约经营,精耕细作和挖潜增效的观念;三是要树立责任、成本、效益意识,营造企业整体重视.项目部全员参与,施工生产全过程控制成本费用的良好氛围。
4 结束语
综上所述,工程施工管理是提高企业市场竞争力、实施成本管理的一个有效手段,提高企业的工程施工管理水平,对企业的发展有着非常重要的作用。本文对当前我国建筑工程施工管理的现状进行了分析,针对当前的一些不足,提出了一些促进提高工程施工管理水平的建议和措施。