have sb. do sth.与have sth. done

来源 :考试(中考版) | 被引量 : 0次 | 上传用户:lyzwrf
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一)have sb.do sth.中的have是使役动词,可用let,make替换;do sth.为省去to的动词不定式短语,作宾语补足语。其意思和get sb.to dn sth.相近,可译为“叫(使、让、要)某人做某事”。该结构一般表示主语的意志,且强调被使役者(其人)。它没有被动形式。例如:He had Xiao Wang repair his watch.他叫小王修理了他的手表。I must have the old barber cut my hair.我得让那位老理发师给我理发。 a) have in sb.do sth. have are causative verbs that can be replaced by let and make; do sth. is a verb infinitive phrase that eliminates to, serving as an object complement. Its meaning is similar to that of get sb.to dn sth. It can be translated as “call (make, ask, ask) someone to do something”. This structure generally expresses the will of the subject, and emphasizes the enlisted person (person). It does not have a passive form. For example: He had Xiao Wang repair his watch. He called Xiao Wang to repair his watch. I must have the old barber cut my hair. I have to let the old barber cut my hair.
其他文献
为提高工作面顺槽的稳定性,防止因深井孤岛工作面煤柱内积聚的弹性能突然释放而发生冲击地压事故,运用FLAC3D数值模拟软件,模拟了不同煤柱宽度的侧向支承压力与剩余弹性应变
本文通过对荣华二采区10
期刊
本文通过对荣华二采区10
期刊
根据当前煤矿企业信息化管理的实际需要,介绍了GIS技术在煤矿企业管理中的应用,重点阐述了利用GIS、WebGIS与Longruan开发平台等技术实现煤矿信息管理的方法与关键技术,旨在为现代煤矿企业信息化提供借鉴。
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
杂志是全国唯一的一份面对驾驶员的刊物.顾名思义,就是广大驾驶员的生活和工作的园地.读者盼了一个月才能得到一期,广大读者是多么希望看到自己喜欢的内容,往往二十个专栏不
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
在理论研究的基础上,利用高原环境模拟舱,对低气压条件下人体皮肤的散热特性进行了实验测试。分析比较了低压与常压条件下人体与环境之间对流换热和蒸发换热的差异,并给出了