论文部分内容阅读
汉江冶炼厂新增2万吨/年的生产线计划于7月份试产,争取8月份正常生产。届时,电铅冶炼能力将达到5万吨/年。该
The new 20,000-ton/year production line of the Hanjiang smelter is scheduled to be trial-produced in July and is expected to be normal in August. At that time, the electric lead smelting capacity will reach 50,000 tons/year. The