1959年3月8日至11日长办苏联专家小组,在丹江口水利枢纽现场查勘了基坑开拕情况,并听取了第一基坑工程地质勘察情况汇报;长江水利科学研究院关于破碎带回填结构的科学研究成果汇报;此外,还听取了丹江口施工总工程师赵鐘灵同志关于枢纽总进度及其第一期保证措施的发言。苏联专家小组就第九、十、十一和十八跨基础处理问题交换意见后,提出以下几点意见和建议:首先,苏联专家组认为必须指出,从本年元月份现场查勘以后,在短短的两个多月时间
From March 8 to March 19, 1959, he organized a long-term Soviet expert team to investigate the excavation of the foundation pit at the Danjiangkou Hydropower Complex and heard a report on the geological survey of the first excavation. The report of the Yangtze River Hydraulic Research Institute Fill in the structure of the scientific research results reported; In addition, also listened to Danjiangkou Chief Engineer Comrade Zhao Zhongling about the overall progress of the hub and its first guarantee measures. After exchanging opinions on the 9th, 10th, 11th and 18th cross-cutting issues, the Soviet expert group made the following comments and suggestions: First, the Soviet expert group believes it necessary to point out that after the on-the-spot survey conducted in January this year, Short more than two months time