论文部分内容阅读
三峡工程论证领导小组第十次(扩大)会议审议通过的《长江三峡水利枢纽可行性研究报告》(以下简称《报告》)是领导小组遵照“中发[1986]15号”文件指示,在广泛征求意见,深入研究论证的基础上,责成长江流域规划办公室根据14个专家组的专题报告编写的。
The feasibility study report of the Three Gorges Project (hereinafter referred to as “Report”) reviewed and approved by the Tenth Third (Extension) Session of the Three Gorges Project Demonstration Leading Group was approved by the leading group in accordance with the document [Zhongfa [1986] No. 15] Soliciting opinions and conducting in-depth research and feasibility studies. They were instructed to organize the Planning Office of the Yangtze River Basin according to the special reports of 14 expert groups.