论文部分内容阅读
一、概况(一)工程内容中山路~解放路铁路地道桥位于我市中心,与铁路交角为73°34′16″,穿越整个铁路客站。全部工程包括:地道桥长505.4m,其中:主体地道106m,穿越铁路九股道及三个站台和预留铁路新增两股道及第一月台位置;东西引道分别为237.25m、162.15m,排水泵房一处和胜利路公路立交桥一座。另外,随着地道修建作了胜利路下水道南延工程和公理街道路改道工程(见图1)。全部工程共动土方15万m~3,混凝土浇注量9600m~3拆迁旧房1690m~2,包括和平路地道桥
I. Overview (I) Project Description Zhongshan Road ~ Jiefang Road Railway The road bridge is located in the center of our city and meets the railway at 73 ° 34’16 "across the entire railway passenger station. All works include: 505.4m long underground bridge, of which: Road 106m, cross the railway Jiuzhe Road and three platforms and railways to add two shares Road and the first platform location; east and west approach were 237.25m, 162.15m, a drainage pump house and a road intersection Shengli Road In addition, along with the construction of the tunnel, the construction of Shengli Road South Extension Project and Gongli Street Road Diversion Project (see Figure 1) were completed. All the projects had a total of 150,000 m 3 earthwork, concrete pouring volume 9600 m 3 and demolition old houses 1690 m 2 , Including Peace Road Road Bridge