论文部分内容阅读
2013年快堆主要运行状态是处于冷停堆工况,期间为进行试验、开堆前检查和维修工作将反应堆转至换料工况。主要运行的系统包括一、二回路主冷却系统,钠辅助系统、气体辅助系统、通风及消防系统等。2013年度,全年无安全事故发生,总计运行7 665班次。完成培训项目6大项,总计2 408.5课时。有97人次完成岗位授权,12人通过操纵人员考试。另外,2013年还开展了如下工作。1)开堆前检查工作包括主控室检查、核岛系统检查、常规岛系统检查、辅助系统检查、辐射防护系统检查、网控系统检查、电气系统检查和换料系统检查8个部分。
The main operational state of the fast reactor in 2013 was a cold shutdown condition during which the reactor was switched to the refueling condition for the purpose of testing, pre-opening inspections and maintenance work. The main operating systems include primary and secondary loop primary cooling systems, sodium assist systems, gas assist systems, ventilation and fire protection systems. In FY 2013, there were no safety accidents throughout the year and a total of 7,665 operations were carried out. Completed 6 major training programs, totaling 2 408.5 class hours. There are 97 people to complete the post authorization, 12 passed the operator examination. In addition, the following work was carried out in 2013. 1) The pre-stack inspection includes 8 parts: main control room inspection, nuclear island system inspection, conventional island system inspection, auxiliary system inspection, radiation protection system inspection, network control system inspection, electrical system inspection and refueling system inspection.