【摘要】小型泵站工程对于区域性的供水与农业灌溉具有至关重要的作用,实践中其主要是城市给排水、农田排灌作业等,在小区域水资源的管理与调度过程中可谓举足轻重。下面谈谈惠农区农田水利泵站的现状以及管理措施。
【关键词】农田;泵站;管理;措施The present condition of the Hui agriculture area farmland irrigation pump station and management measure
Wang Xue zhong
【Abstract】Small scaled pump station engineering for local area of supply water and agriculture irrigation have to the pass importance of function, practice medium it main is a city give drain, farmland row infuse homework etc., it may be said prominent in small water resources in the district of the management with adjust spend the distance.The underneath discuss the Hui agriculture area farmland irrigation a pump station of present condition and management measure.
【Key words】Farmland;Pump station;Management;Measure宁夏石嘴山市惠农区地处青铜峡河西灌区最北端,3乡3镇6个街道办事处,51个居委会,42个行政村,总面积1254平方公里,人口21万人,其中:农业人口6.3万人,2012年实现地区生产总值122亿元。全区实种耕地26万亩,其中:中低产田面积18万亩,占实种耕地面积69.2﹪,由于地处干渠、干沟末梢,地势低洼、地下水位高,灌水难、排水难一直是制约我区农业生产发展的主要因素。经过多年来的项目工程建设农业基础设施得到极大提高,灌排体系基本完善,为我区农业、农村的发展奠定了良好基础。境内有干渠和支干渠6条,分别为:惠农渠,官泗渠,滂渠,兴惠扬黄干渠,礼和扬黄干渠,第二农场渠。干沟、支干沟6条,分别为:第三排水沟,第五排水沟,第六排,第七排水沟,黑龙沟,三排附沟,配套建灌溉机井355眼,其中:沿山灌溉机井54眼,抗旱机井301眼,总装机2663kw。扬水泵站共有扬水泵站6座,分别为兴惠扬黄泵站、礼和扬黄泵站、引五济惠补水站、官泗渠补水站、简泉村一队扬水站、简泉村二队扬水站,总装机27台2389KW。排水站14座,总装机32台638KW。下面来谈谈惠农区农田水利泵站的现状以及管理措施:
1. 农田水利工作泵站的现状
小型农田水利设施是全国小型农田水利建设的重点工程。泵站的区分有两种,灌溉泵站与灌排泵站。根据各个泵站的建设地址不同而有不同的情况划分。在原址上进行一定的修改以及维护和更新是泵站建成花园式的独立院落,在场址的选择与设计方面要与周围的环境相互协调,通过泵房、变压器、管理房进行高标准改建,安装消防栓,在机组以及配电设施周围进行全部的更新,水泵台数可以选择4台,一般情况下运行1台水泵,2台水泵备用,动力采用并且相互匹配,配置专门的降压启动柜,进行安全防护、监测测量的设施,警示标志设置。管理制度及操作规程有一定的操作规划。水工建筑在外部采用嘉祥特色的锯时并且进行镶面,美观大方,防止垃圾以及杂草等缠绕破坏水泵。灌溉泵站对前池和水池设置拦污栅,引水渠和排水沟进行灌排泵站两个结合。严格按照建设的程序组织领导团队建设保证小型农田水利设施顺利实施。负责具体的项目工程建设,在运行管理和管护组织的制度中,严格执行项目法人责任制、建设监理制、招标投标制、合同管理制确保工程建设的质量。水务局的每个项目都是乡镇排出一名副科级以上领导带领工程技术人员进行包办,在施工过程中,包保人员每天进行现场协调和监督,通过发现及时纠正并且帮助工程设施的解决工程中泵出现的各种问题。同时,加强参建人员的各个管理,根据相关的规定解决水库中存在的问题。充分调动地方的积极性和主动性,促进重点项目的实施促进小型灌排泵站建设的有利运行。
2 加强泵站的施工管理措施
严格执行四项基本制度,在小型灌排泵站的施工过程中,进行严格的四项基本制度完成施工规划。作为一名项目法人必须全面履行建设管理的职责。并且委托具有资质的招标代理公司全权负责投标事宜。选择水利水电施工并且进行三级或者三级以上的企业进行施工,各项施工企业严格按照组建施工的强度建设施工项目,项目经理常年驻扎在工地中,方便进行现场技术的施工以及技术管理。资料员随时做好资料的收集以及整编、汇总以及归档工作和严格执行投标书以及建设施工项目部,严格执行工程单元的企业设计,对企业的施工建设的单位工程人员进行验收制,质量等级在施工中受到企业自检和项目法人验收的评定,监理单位作为一个企业,必须严格按照监理程序进行全程监控,对重要部分和隐蔽部位进行监理,发现问题时需要及时沟通对企业进行严格的整改,不放过每一个环节。
农田水利建设的重点在于项目建设质量达到一定程度的重视。结合农田水利设施对重点工程进行一定程度的管理满足对农田设施在水利项目中进行重点指导工作。对质量的考核以及考勤作出一定的控制,并且完成生产安全的文明施工,对设计重点进行一定的规划和实施完成项目的建设重点。规划工程建设,对施工进行合理化的建设,根据管理要求,建设一套完善的工程建设管理制度,组建一个完整的质量监督体系,并且自上而下的进行改革才能保证工程建设过程中质量过硬和工程透明等检查目标。
3. 农田水利管理机制的健全
建立管理机制,完善农田水利建设项目的程序,提高科学管理工作者的业务水平,进行全方位的管理,规划整个环境布局,完善一定程度的水利设施,可以先申请再进行审批,完成施工设施后,对这方面的原则进行一定程度的开发,并且广泛宣传,进行科学有序的管理,使得中小型水利工程得到不同程度的发展。建立农田水利的发展规划目标以及各项审批工作。规划水利工程的建设制度,搞好工程方面的建设,合理利用农田水利设施资源发挥更大的工程效益,并且结合实际情况完成小型水利工程的建设。严格设计教师资格证依据审批工程的规模进行一定程度的资质制度认证,确保聘请有一定资质或者从事这项工作多年的水利工程技术人员对设计单位进行设计,严禁没有资质就使用个人和单位中不正当的渠道获取水利设计的权利,设计图纸在加盖资质的过程中可以进行长久的使用。所有审批中的小型水利工程必须要经过行政主管部门的招标招办。招标工作中需要组织建设单位进行施工准入证的三家或者三家以上的企业或者单位进行运营,依据设计工程项目的设计进行一定程度的工程投资,并且根据相关单位落实工程招标制度,引进竞争机制,规范施工单位的管理,明确工程投资,对工程出现的腐败现象一旦发现,立即遏止。签定公司的合同并且进行一定的施工程序。
4. 结语
总而言之,水利设施的建设还存在一定的生产质量问题,确保建设优质的工程建设要有一套合理健全的监督管理体制,只有规范项目建设管理的程序,才能使施工过程合理化,项目管理严格化,经济费用透明化,只有防止出现豆腐渣工程和面子工程才能保证农业生产不会成为人民生活和农业生产的优质工程,不会随时随地的加强工程项目的后期管理,做到不出事故使得整个项目工程能够长久的发挥助益,确保生产的顺利以及人民可以进行正常的生产生活。
【关键词】农田;泵站;管理;措施The present condition of the Hui agriculture area farmland irrigation pump station and management measure
Wang Xue zhong
【Abstract】Small scaled pump station engineering for local area of supply water and agriculture irrigation have to the pass importance of function, practice medium it main is a city give drain, farmland row infuse homework etc., it may be said prominent in small water resources in the district of the management with adjust spend the distance.The underneath discuss the Hui agriculture area farmland irrigation a pump station of present condition and management measure.
【Key words】Farmland;Pump station;Management;Measure宁夏石嘴山市惠农区地处青铜峡河西灌区最北端,3乡3镇6个街道办事处,51个居委会,42个行政村,总面积1254平方公里,人口21万人,其中:农业人口6.3万人,2012年实现地区生产总值122亿元。全区实种耕地26万亩,其中:中低产田面积18万亩,占实种耕地面积69.2﹪,由于地处干渠、干沟末梢,地势低洼、地下水位高,灌水难、排水难一直是制约我区农业生产发展的主要因素。经过多年来的项目工程建设农业基础设施得到极大提高,灌排体系基本完善,为我区农业、农村的发展奠定了良好基础。境内有干渠和支干渠6条,分别为:惠农渠,官泗渠,滂渠,兴惠扬黄干渠,礼和扬黄干渠,第二农场渠。干沟、支干沟6条,分别为:第三排水沟,第五排水沟,第六排,第七排水沟,黑龙沟,三排附沟,配套建灌溉机井355眼,其中:沿山灌溉机井54眼,抗旱机井301眼,总装机2663kw。扬水泵站共有扬水泵站6座,分别为兴惠扬黄泵站、礼和扬黄泵站、引五济惠补水站、官泗渠补水站、简泉村一队扬水站、简泉村二队扬水站,总装机27台2389KW。排水站14座,总装机32台638KW。下面来谈谈惠农区农田水利泵站的现状以及管理措施:
1. 农田水利工作泵站的现状
小型农田水利设施是全国小型农田水利建设的重点工程。泵站的区分有两种,灌溉泵站与灌排泵站。根据各个泵站的建设地址不同而有不同的情况划分。在原址上进行一定的修改以及维护和更新是泵站建成花园式的独立院落,在场址的选择与设计方面要与周围的环境相互协调,通过泵房、变压器、管理房进行高标准改建,安装消防栓,在机组以及配电设施周围进行全部的更新,水泵台数可以选择4台,一般情况下运行1台水泵,2台水泵备用,动力采用并且相互匹配,配置专门的降压启动柜,进行安全防护、监测测量的设施,警示标志设置。管理制度及操作规程有一定的操作规划。水工建筑在外部采用嘉祥特色的锯时并且进行镶面,美观大方,防止垃圾以及杂草等缠绕破坏水泵。灌溉泵站对前池和水池设置拦污栅,引水渠和排水沟进行灌排泵站两个结合。严格按照建设的程序组织领导团队建设保证小型农田水利设施顺利实施。负责具体的项目工程建设,在运行管理和管护组织的制度中,严格执行项目法人责任制、建设监理制、招标投标制、合同管理制确保工程建设的质量。水务局的每个项目都是乡镇排出一名副科级以上领导带领工程技术人员进行包办,在施工过程中,包保人员每天进行现场协调和监督,通过发现及时纠正并且帮助工程设施的解决工程中泵出现的各种问题。同时,加强参建人员的各个管理,根据相关的规定解决水库中存在的问题。充分调动地方的积极性和主动性,促进重点项目的实施促进小型灌排泵站建设的有利运行。
2 加强泵站的施工管理措施
严格执行四项基本制度,在小型灌排泵站的施工过程中,进行严格的四项基本制度完成施工规划。作为一名项目法人必须全面履行建设管理的职责。并且委托具有资质的招标代理公司全权负责投标事宜。选择水利水电施工并且进行三级或者三级以上的企业进行施工,各项施工企业严格按照组建施工的强度建设施工项目,项目经理常年驻扎在工地中,方便进行现场技术的施工以及技术管理。资料员随时做好资料的收集以及整编、汇总以及归档工作和严格执行投标书以及建设施工项目部,严格执行工程单元的企业设计,对企业的施工建设的单位工程人员进行验收制,质量等级在施工中受到企业自检和项目法人验收的评定,监理单位作为一个企业,必须严格按照监理程序进行全程监控,对重要部分和隐蔽部位进行监理,发现问题时需要及时沟通对企业进行严格的整改,不放过每一个环节。
农田水利建设的重点在于项目建设质量达到一定程度的重视。结合农田水利设施对重点工程进行一定程度的管理满足对农田设施在水利项目中进行重点指导工作。对质量的考核以及考勤作出一定的控制,并且完成生产安全的文明施工,对设计重点进行一定的规划和实施完成项目的建设重点。规划工程建设,对施工进行合理化的建设,根据管理要求,建设一套完善的工程建设管理制度,组建一个完整的质量监督体系,并且自上而下的进行改革才能保证工程建设过程中质量过硬和工程透明等检查目标。
3. 农田水利管理机制的健全
建立管理机制,完善农田水利建设项目的程序,提高科学管理工作者的业务水平,进行全方位的管理,规划整个环境布局,完善一定程度的水利设施,可以先申请再进行审批,完成施工设施后,对这方面的原则进行一定程度的开发,并且广泛宣传,进行科学有序的管理,使得中小型水利工程得到不同程度的发展。建立农田水利的发展规划目标以及各项审批工作。规划水利工程的建设制度,搞好工程方面的建设,合理利用农田水利设施资源发挥更大的工程效益,并且结合实际情况完成小型水利工程的建设。严格设计教师资格证依据审批工程的规模进行一定程度的资质制度认证,确保聘请有一定资质或者从事这项工作多年的水利工程技术人员对设计单位进行设计,严禁没有资质就使用个人和单位中不正当的渠道获取水利设计的权利,设计图纸在加盖资质的过程中可以进行长久的使用。所有审批中的小型水利工程必须要经过行政主管部门的招标招办。招标工作中需要组织建设单位进行施工准入证的三家或者三家以上的企业或者单位进行运营,依据设计工程项目的设计进行一定程度的工程投资,并且根据相关单位落实工程招标制度,引进竞争机制,规范施工单位的管理,明确工程投资,对工程出现的腐败现象一旦发现,立即遏止。签定公司的合同并且进行一定的施工程序。
4. 结语
总而言之,水利设施的建设还存在一定的生产质量问题,确保建设优质的工程建设要有一套合理健全的监督管理体制,只有规范项目建设管理的程序,才能使施工过程合理化,项目管理严格化,经济费用透明化,只有防止出现豆腐渣工程和面子工程才能保证农业生产不会成为人民生活和农业生产的优质工程,不会随时随地的加强工程项目的后期管理,做到不出事故使得整个项目工程能够长久的发挥助益,确保生产的顺利以及人民可以进行正常的生产生活。