论文部分内容阅读
某銅矿在中共地委、專署的直接領导下,在有色冶金設計院、选矿研究院的大力支持亲临指导下,認真貫彻了上级党委和冶金工业部的指示,一座小型选矿厂已建成投入了生产。現仅將建设这座小选厂的试点工作簡單介紹于下。选厂的建設 冶金工业部在1958华10月中旬將这个任务交給該矿后,矿党委立即作了讨论和佈置,决定由矿委亲自掛帅,并抽調10名干部和百多名工人負责建筑安裝工程,全部设备的制造由该矿机械修
Under the direct leadership of the CPC Central Committee and the agency and under the direct support of the Non-ferrous Metallurgical Design Institute and the Mineral Processing Research Institute, a copper mine conscientiously implemented the instructions of the Party committee and the Ministry of Metallurgical Industry at a higher level. A small-scale beneficiation plant has been completed Put into production. Now only the construction of this small factory pilot work is briefly introduced below. Construction of the selected plant The Ministry of Metallurgical Industry handed over this task to the mine in mid-October 1958. The coal mine committee immediately discussed and arranged the decision, which was decided by the mine commissioner himself and the deployment of 10 cadres and over 100 workers. Responsible for construction and installation works, the manufacture of all equipment by the mine mechanical repair