论文部分内容阅读
地处鄂中的京山县,长期坚持实施电力扶贫共富工程,收到巨大的经济效益.人们常说:经济要发展,电力要先行.京山人对此深有体会.从1986年开始,为了解决长期以来因用电卡口而制约经济发展的问题,在国家投入有限的情况下,采取多形式、多层次、多渠道集资的方式集资400万元,加上国家投入的700万元,建起了第一座22伏容量9万千伏安的马家榜变电站.当时,这在全国还是首例.此后,县里又先后集资2500多万元,建起了三座11万伏变电站,13座35KV变电站.全县拥有10KV高压线路2825km,低压线路5644km,配变装机2113台,
Located in Jingshan County, Hubei Province, the long-term implementation of the project of power-saving poverty alleviation has received huge economic benefits. People often say that the economy needs to be developed and the power industry must go first. Jingshan people have a deep understanding of this. Since 1986, Solve the problem of economic development that has been constrained by the use of power bayonet for a long time. With limited national investment, the government will use a multi-modal, multi-level, multi-channel fund-raising approach to raise funds of 4 million yuan, plus 7 million yuan invested by the country. The first 22-volt-capacity 90,000 kVA Majiabang substation was built. At the time, this was the first case in the country. Since then, the county has raised more than 25 million yuan and built three 110,000-volt transformer substations. 13 35KV substations. The county has 10KV high voltage lines of 2825km, low voltage lines of 5644km, and 2113 units of transformers.