北京城建四公司注重在实际中抓技术改革,用技改提高施工质量和速度。他们承担的水利部现代化综合办公楼工程暖通管道多,施工难度大,工期紧,用传统的手工制作方法完成风管制作安装很难满足施工要求。因此他们成立技改小组,经过半个月设计、定型、测试,试制出风管咬口轧边机,能随时轧制不同型号板材和风管,产品美观,密封性好,质量可靠,提高工效3.5倍。
Beijing Urban Construction Fourth Company pays attention to the technical reforms in practice and uses technical innovation to improve construction quality and speed. The Ministry of Water Resources’ multi-purpose modern office building project they undertake has many HVAC pipes, and the construction is difficult and the construction period is tight. It is difficult to meet the construction requirements by using traditional hand-made methods to complete the production and installation of air ducts. Therefore, they set up a technical reform team, after half a month of design, setting, testing, trial production of wind pipe bite edge rolling machine, can roll different types of plates and ducts at any time, beautiful products, good sealing, reliable quality, improve work efficiency 3.5 times.