论文部分内容阅读
2002年,原潮阳市获批准列入改造25所危破小学校舍,除1所正在加快施工进度外,其余24所已竣工,陆续交付使用。去年,关埠镇堂后村在村、镇领导和外出工作的乡亲支持、帮助下,投资80余万元,建成占地7742平方米、建筑面积995平方米的两层教学楼,告别了在席厂改建的简陋校舍。仙城镇东浮山村在香港、深圳经商办厂的冯炳荣、朱镇辉、冯水兴以及100多位海内外有识之士热心乡梓公益事业,捐资200多万元,建成占地面积7800平方米、建筑面积3200平方米的二幢三层教学楼、校舍。在改危建校期间,原潮阳市建设局属下的设计院和质监站从领导到工程师集思广益,几易其稿。在施工中,质监站由11名工程技术人员组成5个质监组,把
In 2002, the original Chaoyang City was approved to be included in the transformation of 25 endangering primary school buildings, with the exception of one being speeding up the construction progress, the remaining 24 have been completed and delivered one after another. Last year, Guanbu Town Hall Village in the village, town leaders and folks working outside the village support, with the help of more than 80 million investment to build an area of 7,742 square meters, construction area of 995 square meters of two-story teaching building, bid farewell to the plant Remodeled shabby schoolhouse. Fung Ping Fung Wing Fung Village in Hong Kong, Shenzhen, set up factories in Fung Ping-wing, Zhu Zhenhui, Feng Shui-hing and more than 100 people of insight at home and abroad enthusiastic Xiangzi public donations of more than 200 million yuan, built covers an area of 7,800 square meters, construction area 3200 square meters two three-story teaching building, school building. During the period of changing schools, the original Design Institute and Quality Supervision Station of Chaoyang Construction Bureau took a collective lead from the leaders to the engineers, and made several drafts. In the construction, Quality Supervision Station consists of 11 engineers and technicians to form five quality supervision teams