面对作业量加大和井下作业成本提高的不利形势,孤东采油厂以井下作业项目组为依托,精细井下作业生产运行,加强日常躺井控制,加大措施方案审核把关力度,狠抓施工现场监督,建立井下作业成本预警管理办法,严把结算审核关,严格井下作业成本的考核与分析,依托八项“环节”治理,逐步提高了井下作业成本控制的效果。
In the face of the unfavorable situation of increasing the workload and increasing the underground operation cost, Gudong Oil Production Plant relies on the downhole operation project team to produce and operate the fine downhole operation, strengthen daily well control, intensify the examination and control of measures and pay close attention to the construction site Supervise and establish early-warning management measures for downhole operation costs, strictly examine and verify clearance and strictly downhole the assessment and analysis of operation costs, and gradually improve the effect of downhole operation cost control based on the control of eight “links”.