论文部分内容阅读
介绍了 1999年 4月在腾冲火山地区进行人工地震测深工程 (简称“腾深 99工程”)的目的意义与测线布设的设计思路 ,并考虑到腾冲地区的地形情况和交通条件提出了一套合理的设计方案。在现场的实际施工中收到了良好的效果。
This paper introduces the purpose of the artificial seismic sounding project in Tengchong volcanic area in April 1999 (referred to as “Tengshen 99 Project”) and the design idea of measuring the layout. Taking into account the topography and traffic conditions in Tengchong area, Set of reasonable design. In the actual construction site has received good results.