102国道是连接京、津、冀、辽、吉、黑四省两市的公路运输大动脉,全长约1334km为把102国道建成具有中国特色的标准化、美化公路,部决定从1989年起,用3年时间对全线实施GBM工程。根据部(89)交函工字347号《关于印发和实施102国道GBM工程标准(试行)的通知》要求,1992年10月8~17日,部组织对102国道全线GBM工程进行了检查验收,并评比出了七个实施GBM工程的先进单位。现将检查验收、评比情况通报如下:
National Highway 102 is a highway artery linking Beijing, Tianjin, Hebei, Liaoning, Jilin and Heilongjiang provinces with a total length of about 1334 km. To build National Highway 102 into a standardized and landscaped highway with Chinese characteristics, the Ministry decided to use Three years to implement GBM project across the board. According to Circular 89 of the Ministry of Communications (89) Notice on Issuing and Implementing GBM Engineering Standards for National Highway 102 (Trial Implementation) No. 347, from October 8 to October 17, 1992, the ministry organized inspection and acceptance of all GBM projects on State Highway 102 , And out of seven advanced units implementing GBM projects. Now check and acceptance, evaluation of the situation informed as follows: